BECC MOD 1 TEST ALL SOLUTION LATEST UPDATE 2024 GUARANTEED GRADE A+
What ARE 3 considerations when dealing with electrical burns? Electrical current may burn a large area just below the surface Perform CPR if needed Treatment is the same as for a thermal burn (True/False) Section 300 of the PQS book list infrequent task and abnormal conditions. TRUE 7 Best UK Staycations for Your Next Caravan Holiday 0:24 / 1:01 The overall purpose of PQS is to ...... provide a means to qualify ships personnel. (True/False) PQS provides an effective way to monitor an individual's qualification progress. TRUE When can your Final Qualification Page be signed?. After all line items have been completed and signed Vocabulary used in each qualification can be found in the ....... Section of the PQS book. FUNDAMENTALS Progress and completed qualifications of each person in the division are displayed on/in the ....... PROGRESS CHART Who is the final qualification authority? COMMANDING OFFICER A five inch outside micrometer will measure objects that are ....... inches thick. 4-5IN A Dial indicator may be used to....... ALIGN MACHINERY It is NOT safe to operate electrical power tools in areas where ....... is/are present. FLAMMABLE GASES Electrical power tools must be inspected prior to issue by a qualified ....... ELECTRICIAN A torque wrench is used to measure the tightness of ... FASTENERS Torque wrenches are considered ....... equipment PRECISION If a maintenance procedure does not specify a torque sequence, utilize the recommended sequence found in ....... NTM CHAPER 075 Which document contains maintenance requirements pertaining to all equipment in a command? PMS MASTER FILE 16. Which portion of the PMS Master File provides the work center supervisor a ready reference of planned maintenance requirements.? WORK CENTER PMS MANUAL If a planned maintenance action cannot be completed in accordance with the steps listed on the MRC, the maintenance man should ....... STOP AND REPORT TO THE WCS What is used to notify personnel that death or injury may result if the operating procedures and practices are NOT correctly followed? Warnings Which of the following serves as the "Table of Contents" for the Work Center PMS manual? LIST OF EFFECTIVE PAGES (LOEP) The SYSCOM Control Number assigned for each maintenance requirement listed in a MIP must match the number on the corresponding MRC (maintenance requirement card) Materials needed to perform the required maintenance are found on the FRONT OF THE MRC The responsibility to replace a missing MRC belongs to the ....... WORK CENTER SUPERVISOR Who assists the Department Head in managing maintenance at the division level? DIVISION OFFICER Who has the responsibility to maintain the list of effective pages? WORK CENTER SUPERVISOR Which schedule is NOT used in the 3M system? DAILY Which of the following periodicity code is used when a maintenance requirement is performed monthly? M Which document is use to verify that you have the proper MRC? MIP (MAINTENANCE INDEX PAGE) You must check the ...... to ensure that the weekly schedule is correct. QUARTELY SCHEDULE Material needed to perform a specific PMS action is listed on the ...... MRC (MAINTENANCE REQUIREMENT CARD) The maintenance procedure steps on the MRC are TO BE FOLLOWED PRECISELY The shipboard hazardous material list is provided ...... on the Department of Defense's CDROM. QUARTERLY Requirements for storage of hazardous material are found on the ...... MSDS While grinding or chiseling, what should be used to protect the eyes? CHIPPING GOGGLES Which procedure does NOT require eye protection? NORMAL OPERATION OF A LUBE OIL SYSTEM Who is responsible for ensuring that PMS is performed on eyewash stations? DIVISION OFFICER Which of the following tags/labels prohibits operation of equipment that could endanger personnel or equipment? DANGER TAG Maintenance aboard ship is the responsibility of the ....... SHIPS FORCE An out of calibration pressure gauge must be recorded in section ...... of the Tag-Out log. FOUR What type of activity consists of non-crew members involved in the construction or maintenance of the ship? REPAIR ACTIVITY The Instrument Log is a sequential listing of all labels issued for ....... and ....... instruments. OUT OF COMMISION., OUT OF CALIBRATION All "Cleared" Danger/Caution tag-out Record Sheets are filed in section five until ....... THE NEXT TAG OUT AUDIT (True/False) The second person signing the tags may accompany the person attaching the tags? FALSE Who may authorize hanging of tags and labels? AUTHORIZING OFFICER When hanging tags on a specific valve, the tag should be posted on the ....... VALVE OPERATOR At what level of continuous noise, is single hearing protection required? 84 DB CONTINUED....
École, étude et sujet
- Établissement
- BECC MOD 1 TST
- Cours
- BECC MOD 1 TST
Infos sur le Document
- Publié le
- 6 février 2024
- Nombre de pages
- 6
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
what are 3 considerations when dealing with electr
-
treatment is the same as for a thermal burn true
-
7 best uk staycations for your next caravan holida
-
he overall purpose of pqs is to provide a m