GCSS-Army Watercraft in GCSS-Army Test 1
GCSS-Army Watercraft in GCSS-Army Test 1 1. When creating an OBSL work order, the 4 low priority list item is selected. -Answer-b. FALSE 2. When a change is made to the OBSL BOM, a new XML file is received into GCSS-Army via the ______, which results in an update to the existing OBSL BOM. -Answer-d. SAP Business Workplace 3. The Open Web Service (OWS)/Universal Data Exchange (UDEx) Interface links information from the ______ to GCSS-Army. -Answer-b. Logistics Support Vessel (LSV) 4. When installing equipment a(n) _____notification must be created. -Answer-b. D1 Notification 5. The intent of the OBSL work order is to be able to compare the OBSL material requirement quantities with the ______. -Answer-a. On-hand material quantities 6. The nomenclature for the OBSL work order description is the OBSL, followed by the watercraft vessel ______. -Answer-c. Advanced Shipment Notification (ASN) Number 7. True or False? The OBSL work order is not to be released. -Answer-a. TRUE 8. The OBSL work order that is created for a watercraft mission is used for material replenishment. -Answer-b. FALSE 9. The ______ is used to view the provisional on-hand material quantities. -Answer-b. BOM History (ZBOMHIST)
École, étude et sujet
- Établissement
- GCSS-Army
- Cours
- GCSS-Army
Infos sur le Document
- Publié le
- 3 février 2024
- Nombre de pages
- 2
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
gcss army watercraft in gcss army test 1
Aperçu du contenu
Document également disponible en groupe