SAFe APM Questions with 100% Correct Answers 2023
What determines when a Feature is ready to move to the next column in the Program Kanban? Policies Work in process (WIP) limits Definition of done Definition of ready - Policies Which two sources are most likely to help when creating a compelling product Vision? (Choose two.) Agile Teams Customer feedback Competitor analysis Stakeholder analysis Team Backlogs - Agile Teams Customer feedback Which aspect of whole-product thinking captures a Customer's price sensitivity? Augmented product Expected product Potential product Generic product - Augmented product To foster alignment during the PI execution, the Product Manager may often be asked to facilitate which event in the closed loop system? PO sync Scrum of Scrums System Demo Inspect & Adapt - PO sync What are the key elements of the Solution Intent? Specifications, designs, and tests Strategic Themes and nonfunctional requirements Epics, Features, and Stories Customer segments and product Vision - Specifications, designs, and tests Which horizon describes the desired state as stable solutions that deliver high value with minimal new investment? Horizon 1 Horizon 0 Horizon 2 Horizon 3 - Horizon 1 What are two outputs of a PI Planning event? (Choose two.) Top 10 Features PI retrospective action items Committed PI Objectives Program Board with Dependencies 10-15% allocation to the Architectural Runway - Committed PI Objectives Program Board with Dependencies What does the Solution Context describe? The behavior of the Solution The type of Solution the Customer will use The environment in which the Solution operates The Customer segment for the Solution - The environment in which the Solution operates Who are the three main stakeholders involved in calculating a Feature's weighted shortest job first values? (Choose three.) Release Train Engineer Product Manager System Architects Scrum Master System Team Business Owners - Release Train Engineer Which ceremony tracks the ART's progress towards meeting the Program Increment objectives? ART sync
École, étude et sujet
- Établissement
- SAFe APM
- Cours
- SAFe APM
Infos sur le Document
- Publié le
- 18 décembre 2023
- Nombre de pages
- 13
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
what determines when a feature is ready to move t
Document également disponible en groupe