NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS|
NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS| When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% Correct Answer B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators Correct Answer C. Geothermal generators Which type of solar technology converts electromagnetic energy in sunlight directly into direct current? A. Concentrating solar thermal B. Solar DC inverter C. Photovoltaic D. Solar batteries Correct Answer C. Photovoltaic If a reliability coordinator identifies that there is a potential transmission related problem in the area, who should they notify? A. Marketers in the area B. Other reliability coordinators in the interconnection C. All purchasing selling entities D. Generation operators in the area of the potential problem Correct Answer B. Other reliability coordinators in the interconnection Restoration services on critical telecommunications channels should be available _____. A. 24 hours per day B. Within 12 hours of a telecommunication channel failure C. By the end of the next business day D. Within 72 hours of the contingency occurring Correct Answer A. 24 hours per day According to NERC, A balancing authority may elect to fulfill its contingency reserve obligations by participating as a member of a _____ A. ISO B. Reserve sharing group C. RTO D. Regional reliability organization Correct Answer B. Reserve sharing group If you were to experience the northern lights what would be your concern with the operation of the power system? A. System harmonics causing oscillations B. A reduction of MVAR consumption C. Generator output reduction D. Transformer overheating Correct Answer D. Transformer overheating
École, étude et sujet
- Établissement
- Liberty University
- Cours
- NERC
Infos sur le Document
- Publié le
- 26 octobre 2023
- Nombre de pages
- 54
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
nerc
-
when using a dynamic schedule and the energy profi
-
dry steam plants flash steam plants and binary c
-
which type of solar technology converts electromag
-
if a reliability coordinator identifies that