Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Autre

CAPM Practice Test Questions with Correct Answers

Note
-
Vendu
-
Pages
5
Publié le
26-10-2023
Écrit en
2023/2024

A. Assumptions CM 4.7.2 PMBOK 5.3.3.1 -->Project planning is ongoing as the team analyzes how long it will take to process both a new order and a change order through the new call center. This analysis helps them determine how many employees must be working in the car center based on anticipated customer volume. This is an example of what? A. Determine budget CM 7.13; PMBOK 7.3 -->The project manager and her team are involved in establishing the cost of the project and applying them to the schedule in order to determine when these cost will occur. During the project during which process does this occur? D. initiating, planning, executing, monitoring and controlling, closing (IPEM&CC) CM 3.3.1; PMBOK 1.5.1 -->During project performance, the team will focus on the Project Life Cycle and the project management life cycle. What are the five phases of a project management life cycle (PMLC)? A. Risk Seeker CM 11.2.7; PMBOK 11 INTRO -->The project manager is considering quitting his job to develop a book and supporting products for the project management professional exam, and idea he created outside his job. If it sells well, he plans to start his own company and sell the products full-time. What characteristics is he showing towards risk? D. all of the above (Interactive, Push, Pull) CM 10.3.5; PMBOK 10.1.2.4 -->Which of the following communication methods should be applied to managing project engagement? B. Analogous estimating CM 6.4.2; PMBOK 7.2.2.2 -->The planning is progressing on schedule for the hotel renovation project. The project manager and the team are ready to begin estimating cost. Since the customer needs an estimate as soon as possible, what estimating methods should the team use? C. Sunk Cost CM 7.5; PMBOK NO REF -->You are a project manager assigned to a project that has spent $4,000,000. The original budget was $1,500,000. Senior Management is considering stopping this project. What term describes the $1,500,000 that has been spent so far? D. All of the above (A duration of zero, the competition of a major event in the project, the completion of major deliverables) CM 6.2/6.6.15 PMBOK 6.6.3.2 -->The project manager is having a team meeting and explaining to the team the upcoming Milestones that are due. What are the characteristics of a milestone? B. $10,000.00 CM 7.6.1; Calculating Standard Depreciation use begining value of asset subtracted by ending value then divide by the # of years. -->A new tape backup server has just been purchased for backing up the company's development and release software. The tape backup server cost $50,000 and it's necessary to upgrade the local area network with an ethernet switch, which has a cost of $10,000. The project manager is told that she needs to set up a depreciation schedule for the tape backup server over a five-year period with a value of $0 at the end of this period. She will use standard depreciation in the calculation. What is the amount per year the server will depreciate? A. 95.46% CM 8.8.10; PMBOK chap 8 (95.46% = 2 sigma, 68.26% = 1 sigma, 99.73% = 3 sigma) -->You are doing quality planning on a project the project Charter designates that the quality standard for the project is +/- 2 Sigma. This translates to what percentage? A. Lessons Learned CM 4.11.3; PMBOK GLOSSARY -->The team has just completed the process of evaluating the success of data-cleansing project. The team members analyze how the approach to planning and executing the project work. They documented how the sponsor and Senior Management supported the project? As well as the conflicts that were generated by three functional managers. What have they just completed? D. Slack CM 6.6.4; PMBOK 6.6.2.2 -->Flexability with an activity on a network diagram is also known as what? B. Control SCOPE CM 5.6; PMBOK 5.6 -->The project manager is working with the customer to gain formal acceptance of the documentation deliverables for a software project. The customer is saying that the delieverables are unusable in their present form because they don't align with the project requirements. Upon reviewing documentation, the customer tells the project manager that the requirements are not accurate and do not meet the intended needs of the project. Which of the following will help fix this problem? B. Malow's Hierarchy CM 5.6; PMBOK 5.6 -->A project manager studying different motivation theories is impressed with one Theory which states that that people are not motivated by money but by self-actualization. What theory and practice the project manager? D. The identification of social work packages that can be created outside the WBS, but within the project CM 5.4; PMBOK 5.4 -->The team has had five meetings to decompose the work of the aircraft carrier project. They are making progress and in a few more meetings should have all the decomposition complete for the multi-year project. All of the following are benefits of using a WBS except... C. Conduct procurement CM 12.2; PMBOK 12.2 -->A project will be using a company to provide technicians for a distribution center project. Presently, the project manager is in the contract negotiation with a bender and the negotiations are going smoothly. What process is the project manager involved? B. Acquiring organization CM 12.1.5; -->As the buyer involved in creating the request for proposal (RFP) for an infrastructure project, it will provide the RFP to sellers of products or Services. All of the following are alternative names for a seller except... A. Mandatory Dependency CM 6.3.1; PMBOK 6.3.2.2 -->Crosswinds Custom Homes is building a customer's Dreamhouse; however, rain has delayed the finish by 3 weeks. The schedule shows that the next task is the installation of the windows followed by the installation of outside siding. This is an example of what?

Montrer plus Lire moins
Établissement
CAPM - Certified Associate In Project Management
Cours
CAPM - Certified Associate in Project Management









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
CAPM - Certified Associate in Project Management
Cours
CAPM - Certified Associate in Project Management

Infos sur le Document

Publié le
26 octobre 2023
Nombre de pages
5
Écrit en
2023/2024
Type
Autre
Personne
Inconnu

Sujets

€7,51
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien


Document également disponible en groupe

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Clayjohnson California State University - Channel Islands
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
84
Membre depuis
2 année
Nombre de followers
19
Documents
1947
Dernière vente
6 jours de cela
A+ revision material

A+ Revision Material refers to educational content and resources designed to help students prepare for and excel in their academic assessments, particularly A+ graded exams or courses. These materials typically include study guides, practice exams, flashcards, and other resources that condense and simplify complex subject matter to aid in effective revision. They are created to enhance a student's understanding of the material, reinforce key concepts, and improve their chances of achieving top grades. A+ Revision Material is commonly used by students at various levels of education, from high school to college and beyond, to boost their knowledge and confidence before important examinations.

Lire la suite Lire moins
4,9

195 revues

5
187
4
1
3
2
2
1
1
4

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions