SOS NERC Prep - RElIABILITY Exam Questions and Answers 100% Correct
SOS NERC Prep - RElIABILITY Exam Questions and Answers 100% CorrectSOS NERC Prep - RElIABILITY Exam Questions and Answers 100% CorrectSOS NERC Prep - RElIABILITY Exam Questions and Answers 100% Correct The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by 20 MWs. D) Increase Net Interchange Schedule by 10 MWs. - ANSWER-A) Increase Net Interchange Schedule by 20 MWs. A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen instantaneously in the change of which of the following values? 1. Actual Net Interchange 2. Scheduled Frequency 3. Scheduled Net Interchange 4. Area Control Error A) 4 only B) 1 & 3 C) 1 & 4 D) 3 & 4 - ANSWER-C) 1 & 4 Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties, actual frequency, and all __________. A) Tie lines readings B) Generators output C) Scheduled frequency indications D) Transformer load - ANSWER-A) Tie lines readings
École, étude et sujet
- Établissement
- SOS NERC
- Cours
- SOS NERC
Infos sur le Document
- Publié le
- 8 octobre 2023
- Nombre de pages
- 54
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
sos nerc prep reliability exam questio
-
sos nerc prep reliability stuvia
-
the reliability coordinator just informed you of a
-
a balancing authority has a sudden loss of a large
Document également disponible en groupe