GFEBS L230E Cost Management Process Overview 2022 with complete solution

Note
-
Vendu
-
Pages
5
Grade
A+
Publié le
12-06-2023
Écrit en
2022/2023

GFEBS L230E Cost Management Process Overview 2022 with complete solution Direct Cost A cost such as labor, materials, or supplies that can be traced directly to producing a specific output of an organization, product, and service Indirect Cost A cost that cannot be traced directly to a specific organization, product, and/or service output They often are allocated on a predetermined basis and generally are synonymous with overhead costs such as general and administrative expenses. Funded Cost The value of goods or services received because of an obligation of funds by the organization performing the work Unfunded Cost A cost that is financed by another organization's or activity's appropriations. Variable cost A cost that changes with a change in output fixed cost A cost that remains the same regardless of a change in output sunk cost A cost incurred in the past that will not be affected by any present or future decision incremental cost The increase or decrease in cost that would result from a decision to increase or decrease output levels avoidable cost A cost incurred on an object that will no longer be incurred due to a decision to change the output. unavoidable cost A cost incurred on an object that will be incurred regardless of the decision to change Activity Type An Activity Type is the cost master data that represents a group of resources within a Cost Center. These resource groups have capacity and a unit of measure such as: labor hours, machine hours, square footage, etc. Activity Types are used to produce the products and services of the organization. Cost Center A Cost Center is a responsibility center on which costs are incurred. It has an operational manager who is accountable for the resources consumed to produce the cost center's output. Project A Project is an object used to plan, collect, monitor, and control costs for large scale time-based events in Project Systems, when extensive scheduling and resource management capabilities are required. Projects have definite start and end dates WBS A WBS element is an activity within the Project used to plan and update cost data. Some examples of WBS Elements are: tasks, partial tasks, and work packages

Montrer plus Lire moins
Établissement
Cours









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Cours

Infos sur le Document

Publié le
12 juin 2023
Nombre de pages
5
Écrit en
2022/2023
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

GFEBS L230E Cost Management Process Overview 2022
with complete solution
Direct Cost
A cost such as labor, materials, or supplies that can be traced directly to producing a
specific output of an organization, product, and service
Indirect Cost
A cost that cannot be traced directly to a specific organization, product, and/or service
output They often are allocated on a predetermined basis and generally are
synonymous with overhead costs such as general and administrative expenses.
Funded Cost
The value of goods or services received because of an obligation of funds by the
organization performing the work
Unfunded Cost
A cost that is financed by another organization's or activity's appropriations.
Variable cost
A cost that changes with a change in output
fixed cost
A cost that remains the same regardless of a change in output
sunk cost
A cost incurred in the past that will not be affected by any present or future decision
incremental cost
The increase or decrease in cost that would result from a decision to increase or
decrease output levels
avoidable cost
A cost incurred on an object that will no longer be incurred due to a decision to change
the output.
unavoidable cost
A cost incurred on an object that will be incurred regardless of the decision to change
Activity Type
An Activity Type is the cost master data that represents a group of resources within a
Cost Center. These resource groups have capacity and a unit of measure such as:
labor hours, machine hours, square footage, etc. Activity Types are used to produce the
products and services of the organization.
Cost Center
A Cost Center is a responsibility center on which costs are incurred. It has an
operational manager who is accountable for the resources consumed to produce the
cost center's output.
Project
A Project is an object used to plan, collect, monitor, and control costs for large scale
time-based events in Project Systems, when extensive scheduling and resource
management capabilities are required. Projects have definite start and end dates
WBS
A WBS element is an activity within the Project used to plan and update cost data.
Some examples of WBS Elements are: tasks, partial tasks, and work packages

, Order
Orders are cost objects used to plan, collect, monitor, and settle the costs of jobs and
tasks
Internal Order
An object used to track costs and revenues (in some cases) associated with internal
jobs and tasks. Internal Orders are often used to monitor the costs related to shorter-
term projects or those individual services offered by an organization.
Work Order
A Work Order is a specific task performed on a demand or preventative basis. Work
Orders reside in the Plant Maintenance Module in GFEBS. Work Orders are task-driven
and specific in nature.
Business Process
is a cost object used to capture costs of cross-functional Cost Center activities.
Business Processes are the "work" being performed by the Cost Center and Activity
Types.
Statistical Key Figure
is a unit of measure, including quantity or time, by which costs are reported. For
example, the number of people (headcount) served at a meal in a dining facility.
Cost Management Process
four sub-processes that interact and affect one another.
The sub-processes are:
- Cost Planning
- Cost Accounting
- Cost Analysis
- Cost Controlling
Cost Planning
Set Cost Targets and Efficiency Goals.
Compute Standard Rates

Cost Planning allows managers to plot out the expected costs to accomplish their
assigned mission for the coming year
Cost Accounting
Captures and validates data.
Provides accurate, timely, and relevant data.
Connects operational output/performance data to financial data. Allocates overhead

Cost accounting covers the activities of capturing and collecting primary costs and
assigning secondary costs. All primary costs are collected in cost objects as a result of
a transaction performed in a GFEBS module.
Assignment
The establishment of a relationship between a sending cost object and a receiving cost
object based on a quantity, with a rate for valuation being consumed by the receiver.
Allocation
The establishment of a relationship between a sending cost object to one or more
receiving cost object(s) based on a % (even if a quantity is used to generate a %, e.g.,
number of FTEs).
€10,64
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien


Document également disponible en groupe

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
LECTMAGGY Chamberlain College Of Nursing
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
145
Membre depuis
3 année
Nombre de followers
121
Documents
6310
Dernière vente
3 mois de cela
LECTMAGGY

Here, you will find everything you need in NURSING EXAMS AND TESTBANKS.Contact us, to fetch it for you in minutes if we do not have it in this shop.BUY WITHOUT DOUBT!!!!Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied.

3,2

27 revues

5
7
4
3
3
11
2
0
1
6

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions