Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Resume

Samenvatting - Projectmanagement (2113MDOGCP)

Note
-
Vendu
-
Pages
33
Publié le
26-05-2023
Écrit en
2022/2023

ENGELS Samenvatting aan de hand van de belangrijkste begrippen per les. H1 t/m 8 + 10, 11












Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

Infos sur le Document

Publié le
26 mai 2023
Nombre de pages
33
Écrit en
2022/2023
Type
Resume

Aperçu du contenu

Inhoudsopgave
Lecture 1: Complex projects........................................................................................................................................................................................................... 2
Lecture 2: Project management, the bigger picture........................................................................................................................................................................ 5
Lecture 3: Initiating projects............................................................................................................................................................................................................ 7
Lecture 4: Defining projects............................................................................................................................................................................................................ 9
Lecture 5: Planning and preparing projects.................................................................................................................................................................................. 13
Lecture 6: Implementation & aftercare.......................................................................................................................................................................................... 15
Lecture 7: Managing time............................................................................................................................................................................................................. 16
Lecture 8: Project finance & budget management – process & project management................................................................................................................... 19
Lecture 10: Managing uncertainty & risk...................................................................................................................................................................................... 24
Lecture 11: Managing quality........................................................................................................................................................................................................ 30

,Lecture 1: Complex projects
Project Actionable parts of plans ( structureplans, spatial policy)
3 requirements:
 Timing
 Place (bv project zone, project study area)
 Budget
Strategic projects Projects embedded in strategic plans
Spatial Development Infrastructure projects
Projects (SDP’s)
Type of actors within SDP’s  Public projects (bv. Scheldekaaien)
 Private projects
 Public – private projects
Differentiation between main actors that run the project.
Type of goals SDP’s Single goal or multiple goal
Type of field for SDP’s  Greenfield
o Producing not developed land
 Brownfield
o Producing on developed land (sanitizing before building, more consistent projects)
o More shifting to these types of projects because greenfield is limited.
Type of landscape SDP’s  Urban: landscape projects
 Rural: non-urban projects
Type of SDP’s  Strategic
o Once in a lifetime project
o No routines in place to manage kind of projects
 Operational
o Series of projects that always have the same processes
o With a team that’s always working on those projects.
Management
characteristics of
SDP’s
Complex systems theory  Systems with many components
 Systems with high distinction (= onderscheid) between components
 Mutual dependent  things can go easily wrong. Bv. Parkeerplaats te klein / te groot
dat een effect kan hebben op leven, winkelen, milieu.
Different types of complexity  Technological complexity
o Design & Engineering
o Unicity (= zeldzaam) & nieuwigheid (novelty) v technology  (= overall anders, de
techn. Op de ene locatie is niet hetzeflde als op de andere)

, o Functional interdependencies  (sommige markten kunnen achterlopen met techn.)
o Uncertainty regarding the impact
o Technological dynamics during the project
 Societal complexity
o Many actors involved with different goals  differential impact thus winners &
losers, so projects result in societal struggle
o Bv de ring: port area more infrastructure to use, but less space to live.
o Large societal impact
 Political complexity
o Multi-level governance (te maken met verschillende lagen met een groot project ivm
budget)
o Effect of elections and political volatility (onzekerheid)
o Political strategic behaviour: political actors block each other
o Political logic is different from technological logic: political horse-trading in projects.
 Organizational complexity
o Organizational complexity  public, private, civil society
o Mutual dependency (resource dependency)
o Obliged to cooperate
 Juridical-administrative complexity
o Lot of procedures, environmental legislation, contracts
Megaprojects A separate specie of SDP’s
 Cost > 1 billion
 Many years to build
 Involve multiple stakeholders
 Impact millions of people
Performance of megaprojects shows: Systematic
 Cost overrun
o Cost escalation
 Time slippage
 Non-implementation
 Underperformance or underuse
 Decreasing ambition levels over time.
Theoretical causes of failures  The sublime of megaprojects (= drivers from megaproject initiation)
o 4 sublimes:
 Technological: possibilities in longest-highest-fastest projects
 Political: happy to have monuments and being visible in media & public.
 Economic: happy to get money & jobs from megaprojects.

,  Aesthetic: happiness from design lovers when buildings are beautiful/stylish.
 Optimism bias and deception (= drivers for mega project commitment)
o Pattern of errors is always skewed to the right (cost overrun)
o Their errors are intentional due cost underestimation
o Project promotors are too optimistic about costs & benefits (optimism bias)
 Accountability & Risk
o Ignoring uncertainties by different groups who are involved in decision making of a
megaproject because of no responsibility when things go wrong (accountability =
responsibility)
o Types of risk in megaprojects:
 Cost risk
 Demand risk
 Financial market risk (future interest rates)
 Political risk (regulation, parallel public investment)
o Studies are biased because of no accountability by actors in the decision-making
process.
o Traditional approaches to project management & better approaches
 Sunk costs and the escalation of commitment (= drivers for megaproject escalation)
o Escalation of commitment = tendency to keep investing in “bad” investments (fi old
car, waiting in line)
o Because of:
 Psychological mechanism
 Social drivers
 Project & economic drivers


 Transfer of risk and impacts to outside parties
 Fail
Questions: 1. What are SDP’s 1. Infrastructure projects
2. What are the different forms of 2. Technological, societal, political, organizational, juridical-adminstrative
complexity in Spatial development 3. ?Uncertainties & risks?
projects? 4. drivers from megaproject initiation: 4 types: technological, politic, economic, aesthetic.
3. What are the typical fail factors in Spatial 5. (4) sublimes, optimism bias and deception, accountability & risk, sunk costs and the
development projects? escalation of commitment
4. What is the megaproject sublime?
5. What are causes of megaproject failure?
€7,99
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Mstudent123 Universiteit Antwerpen
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
16
Membre depuis
7 année
Nombre de followers
13
Documents
0
Dernière vente
8 mois de cela

4,2

6 revues

5
4
4
0
3
1
2
1
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions