Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

CLC 222 Mod 6 Special Considerations Exam

Note
-
Vendu
-
Pages
6
Grade
A+
Publié le
14-07-2022
Écrit en
2021/2022

CLC 222 Mod 6 Special Considerations Exam CLC 222 Mod 6 Special Considerations Exam • Here is your test result.The dots represent the choices you have made. • The highlighted questions are the questions you have missed. • Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 7 Questions 1) An Earned Value Management system that is formally validated and accepted by the cognizant contracting officer is required on cost or incentive contracts valued at or greater than . [Define EVM and cost performance reporting] $50 million $20 million $100 million $10 million 2) The American National Standards Institute/Electronic Industries Alliance (ANSI/EIA) established 36 management system guidelines that ensure and provide complete information needed to make management decisions. [Define the major actions required to evaluate the contractor’s engineering efforts and management systems] [Remediation Accessed :N] False True 3) According to the Davis Bacon Act (DBA), contractor employees shall be paid no less than the prevailing wage rates as determined by the Secretary of Labor and . [Analyze the inspection clauses for fixed type and cost reimbursement contracts used in construction] Employees shall be paid no less often than once a week. Employees shall be given 30 days of leave a year. Employees shall be paid at least once every two weeks. Wage rates shall be available on site in the manager’s office files. 4) When "contracting out" governmental functions, it is the policy of the Government to utilize non-personal service contracts whenever possible. Personal services contracts are appropriate only in limited situations as prescribed by the Federal Acquisition Regulations. Choose the correct answer pertaining to service contracts from the following: [Distinguish between personal and non-personal services and act accordingly when working with contractor personnel.] Under a personal services contract, the contractor’s personnel are subject to the supervision and control that prevails in relationships between the Government and its employees. The conversion of a non-personal services contract to a personal services contract is unlikely to occur. The government supervisor may stipulate the contractor’s employees’ duty hours under a non-personal services contract. Under a non-personal services contract, the contractor’s employees may be required to report to a government person. 5) The contractor is performing exceptionally, especially Sally. How do you as the COR recognize Sally's accomplishments? [Evaluate the contractor’s compliance with safety, security, labor, Service Contract Act, environmental law, and regulatory requirements] Talk to the Contracting Officer and recommend that the contractor be sent a letter stating Sally’s accomplishments. Process an On-The-Spot cash award for Sally. Present Sally with a letter of appreciation. Have the Commander present Sally with a Commander’s Coin. 6) Which of the following items is correct based on the surveillance method and its related scenario? [List the contents of a Quality Assurance Surveillance Plan (QASP)/ Performance Assessment Plan (PAP)] [Remediation Accessed :N]

Montrer plus Lire moins
Établissement
Cours









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Cours
Cours

Infos sur le Document

Publié le
14 juillet 2022
Nombre de pages
6
Écrit en
2021/2022
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

CLC 222 Mod 6 Special Considerations Exam
CLC 222 Mod 6 Special Considerations Exam

• Here is your test result.The dots represent the choices you have made.

• The highlighted questions are the questions you have missed.

• Remediation Accessed shows whether you accessed those links.'N' represents links
not visited and 'Y' represents visited links.

Back to Status page
contains 7 Questions

1) An Earned Value Management system that is formally validated and accepted by
the cognizant contracting officer is required on cost or incentive contracts valued at or
greater than . [Define EVM and cost performance reporting]
$50 million

$20 million

$100 million

$10 million


2) The American National Standards Institute/Electronic Industries Alliance (ANSI/EIA)
established 36 management system guidelines that ensure and provide complete
information needed to make management decisions. [Define the major actions required
to evaluate the contractor’s engineering efforts and management systems] [Remediation
Accessed :N]
False

True


3) According to the Davis Bacon Act (DBA), contractor employees shall be paid no less
than the prevailing wage rates as determined by the Secretary of Labor and . [Analyze the
inspection clauses for fixed type and cost reimbursement contracts used in construction]

Employees shall be paid no less often than once a week.

Employees shall be given 30 days of leave a year.

, Employees shall be paid at least once every two weeks.

Wage rates shall be available on site in the manager’s office files.


4) When "contracting out" governmental functions, it is the policy of the Government to
utilize non-personal service contracts whenever possible. Personal services contracts are
appropriate only in limited situations as prescribed by the Federal Acquisition
Regulations. Choose the correct answer pertaining to service contracts from the following:
[Distinguish between personal and non-personal services and act accordingly when
working with contractor personnel.]
Under a personal services contract, the contractor’s personnel are subject to the

supervision and control that prevails in relationships between the Government and its
employees.
The conversion of a non-personal services contract to a personal services contract is

unlikely to occur.
The government supervisor may stipulate the contractor’s employees’ duty hours

under a non-personal services contract.
Under a non-personal services contract, the contractor’s employees may be required to

report to a government person.

5) The contractor is performing exceptionally, especially Sally. How do you as the
COR recognize Sally's accomplishments? [Evaluate the contractor’s compliance with
safety,
security, labor, Service Contract Act, environmental law, and regulatory requirements]
Talk to the Contracting Officer and recommend that the contractor be sent a letter

stating Sally’s accomplishments.
Process an On-The-Spot cash award for

Sally. Present Sally with a letter of

appreciation.

Have the Commander present Sally with a Commander’s Coin.


6) Which of the following items is correct based on the surveillance method and its related
scenario? [List the contents of a Quality Assurance Surveillance Plan
(QASP)/ Performance Assessment Plan (PAP)] [Remediation Accessed :N]
€12,40
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
EducationalHub

Faites connaissance avec le vendeur

Seller avatar
EducationalHub Teachme2-tutor
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
4
Membre depuis
3 année
Nombre de followers
4
Documents
55
Dernière vente
2 année de cela

0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions