ALABAMA (AL) DRAINAGE & CULVERT CONTRACTOR PRACTICE EXAM LATEST QUESTIONS
AND CORRECT ANSWERS GRADE A



**1. According to Alabama state regulations, what is the minimum required bond amount
for a Drainage & Culvert contractor?**

A) $5,000

B) $10,000

C) $15,000

D) $20,000



**Answer: B**

**Explanation:** Alabama Code § 34-14-10 requires a minimum $10,000 surety bond for
drainage and culvert contractors licensed by the Alabama Licensing Board for General
Contractors.



**2. Which Alabama state agency regulates stormwater management during construction
activities?**

A) Alabama Department of Environmental Management (ADEM)

B) Alabama Department of Transportation (ALDOT)

C) Alabama Soil and Water Conservation Committee

D) All of the above



**Answer: D**

**Explanation:** All three agencies have regulatory authority over stormwater
management, with ADEM administering the NPDES permit program, ALDOT having road
construction standards, and the Conservation Committee overseeing erosion control.

,**3. What is the minimum required pipe cover for culverts under unpaved roads according
to ALDOT standards?**

A) 6 inches

B) 12 inches

C) 18 inches

D) 24 inches



**Answer: B**

**Explanation:** ALDOT Standard Specifications typically require minimum 12 inches of
cover for culverts under unpaved roads, with 24 inches for paved roads.



**4. According to Alabama regulations, what is the maximum allowable velocity for unlined
drainage ditches in sandy soil?**

A) 1.5 feet per second

B) 2.0 feet per second

C) 2.5 feet per second

D) 3.0 feet per second



**Answer: B**

**Explanation:** Alabama Erosion and Sediment Control Handbook recommends
maximum 2.0 fps for sandy soils to prevent erosion.



**5. Which type of pipe is NOT approved for permanent storm drainage installations in
Alabama?**

A) Corrugated polyethylene

B) Reinforced concrete

C) PVC Schedule 40

,D) Corrugated metal with asphalt coating



**Answer: C**

**Explanation:** PVC Schedule 40 is typically not approved for permanent storm drainage;
SDR 35 or stronger PVC is required for structural reasons.



**6. What is the minimum required slope for drainage pipes according to ALDOT
standards?**

A) 0.3%

B) 0.5%

C) 1.0%

D) 2.0%



**Answer: B**

**Explanation:** ALDOT typically requires minimum 0.5% slope (0.5 feet per 100 feet) for
drainage pipes to ensure self-cleaning velocity.



**7. According to Alabama regulations, what is the maximum depth for trench excavation
without shoring in stable soil?**

A) 4 feet

B) 5 feet

C) 6 feet

D) 8 feet



**Answer: B**

**Explanation:** OSHA and Alabama regulations allow maximum 5-foot depth without
shoring in Type A or B soils under certain conditions.

, **8. Which of the following requires a NPDES permit in Alabama?**

A) All drainage projects over 1 acre

B) Projects disturbing more than 1 acre

C) Only projects near waterways

D) Projects over 5 acres only



**Answer: B**

**Explanation:** ADEM requires NPDES permits for construction activities disturbing 1
acre or more of land.



**9. What is the minimum required thickness for galvanized corrugated metal pipe (CMP)
under roads in Alabama?**

A) 16 ga

B) 14 ga

C) 12 ga

D) 10 ga



**Answer: A**

**Explanation:** ALDOT typically requires minimum 16 ga galvanized CMP for most
applications, with thicker gauges for higher loads or corrosive conditions.



**10. According to Alabama regulations, how often must erosion control measures be
inspected?**

A) Daily

B) Weekly

C) After each rain event

École, étude et sujet

Établissement
Finance
Cours
Finance

Infos sur le Document

Publié le
18 janvier 2026
Nombre de pages
34
Écrit en
2025/2026
Type
Examen
Contient
Questions et réponses

Sujets

€73,14
Accéder à l'intégralité du document:

Mauvais document ? Échangez-le gratuitement Dans les 14 jours suivant votre achat et avant le téléchargement, vous pouvez choisir un autre document. Vous pouvez simplement dépenser le montant à nouveau.
Rédigé par des étudiants ayant réussi
Disponible immédiatement après paiement
Lire en ligne ou en PDF

Faites connaissance avec le vendeur
Seller avatar
GerryBlair

Faites connaissance avec le vendeur

Seller avatar
GerryBlair University Of Texas - Arlington
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
1
Membre depuis
2 mois
Nombre de followers
0
Documents
60
Dernière vente
1 semaine de cela

0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Documents populaires

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions