Questions And Verified Answers
\Q\.What makes up a quality asphalt mixture? - ANSWERS✔-A quality asphalt mixture is
determined by the constructability, if it conforms to Specifications, and if it satisfies functional
requirements.
\Q\.CQC - ANSWERS✔-contractor quality control
\Q\.Superpave - ANSWERS✔-Asphalt mix design system since 1998
\Q\.QCP - ANSWERS✔-Quality control plan
\Q\.QCM - ANSWERS✔-Quality control Manual
\Q\.QC - ANSWERS✔-Quality Control (Contracting Testing and Inspection)
\Q\.VT - ANSWERS✔-Verification Testing (FDOT or CEI Verification)
\Q\.CEI - ANSWERS✔-Construction Engineering and Inspection
\Q\.RT - ANSWERS✔-Resolution Testing (FDOT)
\Q\.IV - ANSWERS✔-Independent Verification Testing
, \Q\.IA - ANSWERS✔-Independent Assurance Testing
\Q\.The decision-making authority on a job needs to be given to who? - ANSWERS✔-Needs to
be given to the level closet to the work as specified in the specifications. It ensure a quick
handle on situations and issues.
\Q\.The governing order of project documents from high (1) to low (7) starts with the highest
being - ANSWERS✔-Special Provisions
\Q\.The governing order of project documents from high to low (2) - ANSWERS✔-Technical
Special Provisions
\Q\.The governing order of project documents from high to low (3) - ANSWERS✔-Plans
\Q\.The governing order of project documents from high to low (4) - ANSWERS✔-Road design,
structures, and traffic operations standards
\Q\.The governing order of project documents from high to low (5) - ANSWERS✔-
Developmental Specifications
\Q\.The governing order of project documents from high to low (6) - ANSWERS✔-Supplemental
Specifications
\Q\.The governing order of project documents from high to low (7) - ANSWERS✔-Standard
Specifications