Test Bank for Information Technology Project Management, 8th Edition by Kathy Schwalbe

Note
-
Vendu
-
Pages
583
Grade
A+
Publié le
06-01-2026
Écrit en
2025/2026

This is the complete and comprehensive test bank for the 8th Edition of Information Technology Project Management by Kathy Schwalbe. It is an essential assessment and study tool designed to help students master the 10 project management knowledge areas and prepare for professional certification exams like the PMP® or CAPM®.

Montrer plus Lire moins
Établissement
Information Technology Project Management
Cours
Information Technology Project Management











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
Information Technology Project Management
Cours
Information Technology Project Management

Infos sur le Document

Publié le
6 janvier 2026
Nombre de pages
583
Écrit en
2025/2026
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

TEST BANK For, Information Technology Project
Management 8th Edition Kathy Schwalbe


True / False

1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
management in the military, computer, and construction industries.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: Until the 1980s, project management primarily focused on providing
schedule and resource data to top management in the military, computer, and
construction industries. Today’s project management involves much more, and
people in every industry and every country manage projects.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.2
LEARNING OBJECTIVES: INFO.SCHW.14.1 - LO: 1-1
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS: Introduction
KEYWORDS: Bloom's: Knowledge


2. A difference between operations and projects is that operations end when their objectives have been
reached, whereas projects do not.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Projects are different from operations in that they end when their
objectives have been reached or the project has been terminated.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.4
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


3. Every project should have a well-defined objective.
a. True
Cengage Learning Testing, Powered by Cognero Page 1

, b. False
ANSWER: True
RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-defined
objective.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Knowledge


4. Projects should be developed in increments.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are often
defined broadly when they begin, and as time passes, the specific details of the
project become clearer. Therefore, projects should be developed in increments.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


5. Resources in a project should be used effectively because they are limited.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project requires resources, often from various areas. Resources,
however, are limited and must be used effectively to meet project and other
corporate goals.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p. 7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension

Cengage Learning Testing, Powered by Cognero Page 2

,6. A project manager’s primary role is to provide the funding for a project.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: A project sponsor usually provides the direction and funding for a project.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Knowledge


7. One of the main reasons why project management is challenging is because of the factor of uncertainty.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project involves uncertainty. Every project is unique and thus it is
sometimes difficult to define its objectives clearly, estimate how long it will take to
complete, or determine how much it will cost. This uncertainty is one of the main
reasons project management is so challenging.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


8. Questions about how a team will track schedule performance is related to a project’s scope.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Project scope deals with questions such as, “What work will be done as
part of the project?”, “What unique product, service, or result does the customer or
sponsor expect from the project?”, or “How will the scope be verified?”
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Technology

Cengage Learning Testing, Powered by Cognero Page 3

, TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


9. In order to be realistic, a project manager should always set discrete goals instead of a range of
objectives.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Projects involve uncertainty and limited resources. Thus they rarely finish
according to their original scope, time, and cost goals. Instead of discrete target
goals, it is often more realistic to set a range of goals.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.8
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


10. Managing the triple constraint primarily involves making trade-offs between resources and quality.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Managing the triple constraint involves making trade-offs
between scope, time, and cost goals for a project. Experienced project
managers know that one must decide which aspect of the triple constraint is
most important.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.9
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Knowledge


11. The only responsibility of a project manager is to meet the specific scope, time, and cost goals of a
project.
a. True
b. False
ANSWER: False


Cengage Learning Testing, Powered by Cognero Page 4
€16,43
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur
Seller avatar
fanuel

Faites connaissance avec le vendeur

Seller avatar
fanuel Harvard university
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
Nouveau sur Stuvia
Membre depuis
1 semaine
Nombre de followers
0
Documents
26
Dernière vente
-
Academic Success Store | Notes, Summaries & Guides

High-quality, easy-to-understand study notes made to help students pass exams with confidence. Clear explanations, smart summaries, and reliable academic content.

0,0

0 revues

5
0
4
0
3
0
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions