VA DEQ SWM Inspector Exam Questions and Verified Answers Latest 2026/2027 | Actual Exam 100% Correct | Graded A+. The Virginia Stormwater Management Program is authorized by the ______ and administered through the ______ - CORRECT ANSWER-Virginia Stormwater Management Act, Virginia Stormwater Management Program Regulation VPDES Permit/Construction GP authorizes discharge of stormwater from construction activities that are - CORRECT ANSWER-greater than or equal to an acre The Stormwater Management Act requires the State Water Control Board to - CORRECT ANSWER-permit, regulate, and control stormwater runoff DEQ has ___ days to complete review of real or potential interjurisdictional impacts upon request - CORRECT ANSWER-90 The Stormwater Management Act requires the following individuals to obtain and maintain a certificate of competency - CORRECT ANSWER-staff of a stormwater program, anyone contracted by a VSMP authority, standard and specification holders SWM plan must be approved by ___ before land disturbance - CORRECT ANSWER-VSMP program authority The water quality criteria sets a site-based load limit of ____ of total phosphorus for new development - CORRECT ANSWER-0.41 lbs/acre/year The phosphorus load limit uses the - CORRECT ANSWER-10% impervious cover Part II B and II C water quantity criteria addresses - CORRECT ANSWER-channel protection and flood protection Which two plans in the SWPPP must be approved? - CORRECT ANSWER-SWM plan, ESC plan Does the SWM plan address runoff during or after construction? - CORRECT ANSWER-postconstruction What is the lower limit of the range of imperviousness that can result in stream degradation? - CORRECT ANSWER-10% The dual certificate will expire three years from - CORRECT ANSWER-the latest date of the certificates Localities without MS4 - CORRECT ANSWER-may choose to administer a VSMP or have DEQ administer the program DEQ is responsible for enforcing the ____ while locality ____ are responsible for enforcing local ordinances - CORRECT ANSWERConstruction GP, VSMP

Mostrar más Leer menos
Institución
VA DEQ SWM Inspector
Grado
VA DEQ SWM Inspector










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
VA DEQ SWM Inspector
Grado
VA DEQ SWM Inspector

Información del documento

Subido en
18 de diciembre de 2025
Número de páginas
20
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

VA DEQ SWM Inspector Exam Questions and Verified
Answers Latest 2026/2027 | Actual Exam 100% Correct |
Graded A+.



The Virginia Stormwater Management Program is authorized by the
______ and administered through the ______ - CORRECT
ANSWER-Virginia Stormwater Management Act, Virginia
Stormwater Management Program Regulation


VPDES Permit/Construction GP authorizes discharge of stormwater
from construction activities that are - CORRECT ANSWER-greater
than or equal to an acre


The Stormwater Management Act requires the State Water Control
Board to - CORRECT ANSWER-permit, regulate, and control
stormwater runoff


DEQ has ___ days to complete review of real or potential inter-
jurisdictional impacts upon request -
CORRECT ANSWER-90

The Stormwater Management Act requires the following individuals
to obtain and maintain a certificate of competency - CORRECT
ANSWER-staff of a stormwater program, anyone contracted by a
VSMP authority, standard and specification holders

,SWM plan must be approved by ___ before land disturbance -
CORRECT ANSWER-VSMP program authority

The water quality criteria sets a site-based load limit of ____ of total
phosphorus for new development - CORRECT ANSWER-0.41
lbs/acre/year


The phosphorus load limit uses the - CORRECT ANSWER-10%
impervious cover



Part II B and II C water quantity criteria addresses - CORRECT
ANSWER-channel protection and flood protection


Which two plans in the SWPPP must be approved? - CORRECT
ANSWER-SWM plan, ESC plan


Does the SWM plan address runoff during or after construction? -
CORRECT ANSWER-postconstruction

What is the lower limit of the range of imperviousness that can result
in stream degradation? -

, CORRECT ANSWER-10%


The dual certificate will expire three years from - CORRECT
ANSWER-the latest date of the certificates


Localities without MS4 - CORRECT ANSWER-may choose to
administer a VSMP or have DEQ administer the program


DEQ is responsible for enforcing the ____ while locality ____ are
responsible for enforcing local ordinances - CORRECT ANSWER-
Construction GP, VSMP




What do land disturbing activities consist of? - CORRECT
ANSWER-excavating, clearing, grading


LDA threshold for the SWM Act and Regulation - CORRECT
ANSWER-1 acre or 2500 square feet for Chesapeake Bay
Preservation Act


In situations where an initial exemption was applicable because LDAs
were related to emergency work, VSMP authority shall be advised of
the disturbance within - CORRECT ANSWER-7 days of
$16.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ExcelAcademia2026 Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2061
Miembro desde
4 año
Número de seguidores
1648
Documentos
7474
Última venta
1 día hace
EXCEL ACADEMIA TUTORS

At Excel Academia Tutoring, You will get solutions to all subjects in both assignments and major exams. Contact me for assistance. Good luck! Well-researched education materials for you. Expert in Nursing, Mathematics, Psychology, Biology etc. My Work has the Latest & Updated Exam Solutions, Study Guides and Notes (100% Verified Solutions that Guarantee Success)

3.7

337 reseñas

5
139
4
74
3
62
2
19
1
43

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes