2025/2026

Michigan Builders license exaM PreP 2026/2027 coMPlete Frequently tested questions and VeriFied answers with rationales | | already graded a+ &lt;recent Version&gt; 1. IRC (International Residential Code) - ANSWER Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. 2. First 2 chapters of code book are - ANSWER Administrative 3. Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F - ANSWER True 4. states. - ANSWER 12 5. Square edge vertical siding requires the joints to be covered with slender pieces of solid wood called __________________. - ANSWER battens 6. Horizontal siding requires a lap of at least 1 inch, unless rabbeted. When rabbeted it is 1/2 inch. Plain beveled siding is also called ___________________. - ANSWER clap board siding 7. Building felt is available in 15 lb. or 30 lb. weight. It is used to protect wall sheathing from moisture. It comes in rolls 36 inches wide and is applied horizontally with joints lapped at least __________________. - ANSWER 2 inches 8. When installing building felt on exterior walls, if a vertical joint is needed, it should be lapped at least _____________. - ANSWER 6 inches 9. Housewrap is used as an alternative to felt paper over wall sheathing. It has the ability to allow water vapor to pass through, but not liquid water. T F - ANSWER True 10. Plywood panel siding applied vertically may have vertical shiplapped joints or a square edge. The square edge panel requires battens that cover the joints, but the horizontal square edge joints require __________________. - ANSWER Z flashing 11. As with all siding, vinyl siding requires a weather resistive barrier between the siding and the wall sheating. T F - ANSWER True 12. When installing vinyl siding panels, nails should be driven straight, in the middle of the nailing slot and NEVER driven tight. This allows the panel to expand and contract without warping. T F - ANSWER True 13. It is not necessary to prime or seal the edges and end of plywood panel siding before installation. T F - ANSWER False 14. Horizontal joints between courses of beveled siding should ______________ be caulked. - ANSWER Never 15. A willful violation of building laws of the state subject to penalties? - ANSWER Yes 16. Who does the homeowner need to send a copy of a complaint to? - ANSWER Licensee being complained upon 17. What would cause the department to wait to initiate proceedings against you. - ANSWER Providing them with alternative dispute resolution procedure. 18. What shall the department do with all final orders? - ANSWER Upload to state Website within 30 days 19. What should the department post anually on its website? - ANSWER Number of final orders of the board. 20. Can you place lien on real property with out a license? - ANSWER Nope 21. Who may come after you and what may be your penalty for not have a license? - ANSWER Attorney General or prosecuting attorney, an a fine not less than $5,000 and not more than $25,000 22. What does the code define "Board" as? - ANSWER The State Residential Builders and Maintenance and alteration contractors board. 23. Who does the coded refer to the "Department" as? - ANSWER LARA 24. What does a residence license application require? - ANSWER 1. Address of residence 25. 2. Address of principal place of business. 26. What does a non resident license application require? - ANSWER 1. Address of residence outside of state 27. 2. Address of principal place of business in state 28. 3. Consent to service form 29. How long is a passing exam score valid? - ANSWER 1 year 30. What shall the department issue you once you've completed all requirements? - ANSWER Identification Card 31. What address will be on the license? - ANSWER Physical office Location, which can be your home. 32. Upon approval the department shall issue a ____ and an ______________ _____ containing the name and business address for the salesperson. They should show these to all prospective customers. - ANSWER License and Identification Card 33. When a salesperson license under this act is discharge, what must happen - ANSWER Within 5 days the contractor must return license to the department and within 5 days the sales person shall return the ID card to the department.

Mostrar más Leer menos
Institución
Michigan Builders License
Grado
Michigan builders license











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Michigan builders license
Grado
Michigan builders license

Información del documento

Subido en
15 de diciembre de 2025
Número de páginas
117
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Michigan Builders license exaM PreP
2026/2027 coMPlete Frequently tested
questions and VeriFied answers with
rationales | | already graded a+
<recent Version>


1. IRC (International Residential Code) - ANSWER Created to serve as a
complete, comprehensive code regulating the construction of single-family,
two-family and buildings consisting of three or more townhouse units.


2. First 2 chapters of code book are - ANSWER Administrative


3. Plans or supporting documents are almost always required by the controlling
authority prior to issuing a permit. T or F - ANSWER True


4. states. - ANSWER 12


5. Square edge vertical siding requires the joints to be covered with slender
pieces of solid wood called __________________. - ANSWER battens


6. Horizontal siding requires a lap of at least 1 inch, unless rabbeted. When
rabbeted it is 1/2 inch. Plain beveled siding is also called
___________________. - ANSWER clap board siding

,7. Building felt is available in 15 lb. or 30 lb. weight. It is used to protect wall
sheathing from moisture. It comes in rolls 36 inches wide and is applied
horizontally with joints lapped at least __________________. - ANSWER 2
inches


8. When installing building felt on exterior walls, if a vertical joint is needed, it
should be lapped at least _____________. - ANSWER 6 inches


9. Housewrap is used as an alternative to felt paper over wall sheathing. It has
the ability to allow water vapor to pass through, but not liquid water. T F -
ANSWER True


10.Plywood panel siding applied vertically may have vertical shiplapped joints
or a square edge. The square edge panel requires battens that cover the
joints, but the horizontal square edge joints require __________________. -
ANSWER Z flashing


11.As with all siding, vinyl siding requires a weather resistive barrier between
the siding and the wall sheating. T F - ANSWER True


12.When installing vinyl siding panels, nails should be driven straight, in the
middle of the nailing slot and NEVER driven tight. This allows the panel to
expand and contract without warping. T F - ANSWER True


13.It is not necessary to prime or seal the edges and end of plywood panel
siding before installation. T F - ANSWER False

,14.Horizontal joints between courses of beveled siding should
______________ be caulked. - ANSWER Never


15.A willful violation of building laws of the state subject to penalties? -
ANSWER Yes


16.Who does the homeowner need to send a copy of a complaint to? -
ANSWER Licensee being complained upon


17.What would cause the department to wait to initiate proceedings against you.
- ANSWER Providing them with alternative dispute resolution procedure.


18.What shall the department do with all final orders? - ANSWER Upload to
state Website within 30 days


19.What should the department post anually on its website? - ANSWER
Number of final orders of the board.


20.Can you place lien on real property with out a license? - ANSWER Nope


21.Who may come after you and what may be your penalty for not have a
license? - ANSWER Attorney General or prosecuting attorney, an a fine not
less than $5,000 and not more than $25,000


22.What does the code define "Board" as? - ANSWER The State Residential
Builders and Maintenance and alteration contractors board.

, 23.Who does the coded refer to the "Department" as? - ANSWER LARA


24.What does a residence license application require? - ANSWER 1. Address of
residence
25.2. Address of principal place of business.


26.What does a non resident license application require? - ANSWER 1. Address
of residence outside of state
27.2. Address of principal place of business in state
28.3. Consent to service form


29.How long is a passing exam score valid? - ANSWER 1 year


30.What shall the department issue you once you've completed all
requirements? - ANSWER Identification Card


31.What address will be on the license? - ANSWER Physical office Location,
which can be your home.


32.Upon approval the department shall issue a ____ and an ______________
_____ containing the name and business address for the salesperson. They
should show these to all prospective customers. - ANSWER License and
Identification Card


33.When a salesperson license under this act is discharge, what must happen -
ANSWER Within 5 days the contractor must return license to the
department and within 5 days the sales person shall return the ID card to the
department.
$15.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Tutorpatrick

Conoce al vendedor

Seller avatar
Tutorpatrick Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
Nuevo en Stuvia
Miembro desde
2 semanas
Número de seguidores
0
Documentos
6
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes