NICET Highway Construction Inspector Level III
Practice Exam 1 Exam comprehensive questions |
FREQUENTLY MOST TESTED QUESTIONS AND
VERIFIED SOLUTIONS/GET IT 100% ACCURATE!!
2025!!
Save
Terms in this set (56)
During installation of a) Do not allow vehicular traffic over an open saw cut.
traffic loops in the c) Thoroughly clean the saw cut of foreign material.
pavement, which three d) Use a plastic sleeve where loop wire crosses a
statements apply prior to joint.
and during the installation
of loop wire? (Choose 3).
a) Do not allow vehicular
traffic over an open saw
cut.
b) Do not overlap saw
cuts at the corner.
c) Thoroughly clean the
saw cut of foreign
material.
d) Use a plastic sleeve
where loop wire crosses a
joint.
https://quizlet.com/1114718140/nicet-highway-construction-inspector-level-iii-practice-exam-1-exam-comprehensive-questions-frequently-most-tested… 1/29
,11/30/25, 11:54 AM NICET Highway Construction Inspector Level III Practice Exam 1 Exam comprehensive questions | FREQUENTLY MOST TESTE…
The contractor is installing ?
a culvert with a 12-inch
reinforced concrete pipe (
outside diameter of 16.50
inches) from Sta 10+00, 40
feet Left to STA 10+00, 65
feet Right on 4-inch
bedding material. The 12-
inch RCP outlet is to be
installed at Sta 10+00, 40
feet Left at an invert
elevation of 652.50.
If the conduit is installed
at a 1.40% slope, what is
the elevation of the
foundation grade at Sta
10+00, 45 feet Right?
a) 652.04
b) 653.17
c) 653.36
d) 653.50
https://quizlet.com/1114718140/nicet-highway-construction-inspector-level-iii-practice-exam-1-exam-comprehensive-questions-frequently-most-tested… 2/29
, 11/30/25, 11:54 AM NICET Highway Construction Inspector Level III Practice Exam 1 Exam comprehensive questions | FREQUENTLY MOST TESTE…
On the reservoir side of a b) maximum water elevation
dam, erosion protection
against wave action
should extend up the
slope to at least which
level?
a) crest of dam
b) maximum water
elevation
c) minimum water
elevation
d) two-thirds the height of
the dam
During stage construction c) Maintain the existing drainage system until the new
while installing drainage, system is functional.
the contractor must d) Provide temporary connections as needed to
complete which two of maintain the existing system.
the following tasks?
(Choose two).
a) Bulk head the pipe until
the system is complete.
b) Complete the entire
system before it rains.
c) Maintain the existing
drainage system until the
new system is functional.
d) Provide temporary
connections as needed to
maintain the existing
system.