What is air that contacts the oil before it leave the nozzle
called? - ANSWER-Primary air
What is required upon installation to operate a boiler? -
ANSWER-Inspection and test resulting in equipment use
permit from commissioner
How often should a boiler be inspected? - ANSWER-Once
a year
,2|Page
What documentation is required from a certificate holder?
- ANSWER-Owners annual statement
What is required to hydrostatically test upon installation
and who should perform these tests? - ANSWER-Liquid
fuel piping and fuel oil storage tanks by the installing
contractor
At what pressure should piping be tested? - ANSWER-1/2
max working pressure but less than pressure required for
storage tank
, 3|Page
At what pressure should oil storage tanks be tested? -
ANSWER-At 1 1/2x max working pressure but never < 25
psi
How long should hydrostatic pressure be maintained? -
ANSWER-Until all joints and connections are inspected for
leaks and at 30 minutes have passed
Who is responsible for testing gas distribution piping? -
ANSWER-Installing contractor before closing and
operation