To provide a safe working environment for employees of a
company
The primary premise behind TO show that there is an obligation and responsibility of
OSHA is? the employer to provide first aid training and
equipment in the workplace
To communicate that your personal safety is still
your individual responsibility To set and enforce
workplace health and safety standards
Which of the following Grounding prong & insulation for nicks, cuts, or damages
items should you inspect
on an extension cord before
each use?
When drilling in a hole in a 7' Safety goggles
wooden stud what eye
protection should be
worn?
Personal safety is who's Your responsibility
responsibility?
When working near exposed Use insulated tools
energized conductors or
circuit part, and the
possibility exist that the
inspectors tool might
contact exposed
energized conductors, the
inspector shall?
An individual suffers a deep Apply direct pressure to the wound and elevate the leg
cut on the upper leg from a
blunt force. There is
,profuse bleeding from the
wound area. What action
should be taken first?
Dull and sunken eyes
Physical shock symptoms Pale or bluish, cool, moist
skin Weakness, nausea,
strong thirst
PPE or blood-borne True
pathogens cannot permit
blood or other infectious
materials to pass though
to reach the employee or
his/her apparel, skin,
eyes, mouth or mucous
membranes.
NFPA 170? Standards for fire safety and emergency symbols
NFPA 20? Stationary pumps handbook- provides a pump installation plan
checklist
Standard for the Installation of Private Fire Service
NFPA 24?
Mains and Their Appurtenances
Which drawings in the Architectural elevation
construction package best
shows building appearance,
building height to
foundation, grade,
building width, roof detail,
etc.
A drawing of a building Elevation
showing the vertical plane
dimensions is a?
Parapet
What does a parapet look
like?
What does a hose station,
dry standpipe look like?
,The perimeter of Broken lines
canopies, sheds, and
other open-walled
structures is indicated on
drawings by?
Whats the symbol for water
motor gong?
Symbol for indicating a
butterfly valve?
Symbol for indicating a foam
reel station?
The owners information Type, arrangement, location, and intended maximum quantities
certificate indicates the
property to be protected will
contain nitrate film. Which of
the following is also
required to be provided?
Water flow information The drawings that accompany the owners information certificate
should be contained in
which of the following?
Which standard GSA form SF 1442
has replaced standard
form 23?
A bid package for a fire 1. There will be additional administrative costs
protection system to be associated with meeting with requirements of
installed in a federal compliance with this contract
government installation 2. Failure to comply may results in termination of
contains affirmative action the contract and associated penalties
clauses and agreements of 3. The requirements to employ minority workers may
compliance, as well as impact not only this contract, but also hours worked
designation a percentage on all jobs within your company
of minorities that must be
hired. How do these impact
, you as a bidder?
A bid package for a fire 1. The Bacon-Davis and Copeland Acts require all
protection system to be contractors to pay labor rates consistent with locally
installed in a federal prevailing wages, for both union and non-union
government installation workers
contains a standard from 2. The Contract Work Hours and Safety Standards Act
requiring compliance with will determine the overtime provisions for your
the Copeland Act, the workers
3. The ratio of apprentices to journeymen you can use on the job
Contract Work Hours and may be limited
Safety Standards Act and
the Bacon-Davis Act. How
do these Acts impact you as
a bidder to the contract?
You bid a job well in Check the instructions to bidders, following the steps to
advance and prior to the submit a bid modification, if permitted, or following
deadline you discover you the steps for bid withdrawal if needed
missed a provision of the
system. Which of the
following steps should
you follow?
1. Contains the names of the parties involved
2. References the contract documents
A basic contract is?
3. Discusses the work that is to be done
4. Discuss start and completion dates