MICHIGAN BUILDERS LICENSE CERTIFIED QUALITY EXAM QUESTIONS WITH CORRECT ANSWERS NEWEST 25/26 LATEST A+ SCORE REVIEW

Institución
Michigan Builders
Grado
Michigan builders











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Michigan builders
Grado
Michigan builders

Información del documento

Subido en
1 de noviembre de 2025
Número de páginas
86
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

MICHIGAN BUILDERS LICENSE CERTIFIED QUALITY EXAM
QUESTIONS WITH CORRECT ANSWERS NEWEST 25/26 LATEST A+
SCORE REVIEW


False. - ---Answers---it is permissible for supply ducts to be
run through the framing cavities of a residential building. T or f

Ic rated (insulation contact) - ---Answers---__________ means an
electrical fixture has been tested and listed as suitable for
installation in a cavity where the fixture may come in contact
with insulation.

3%. - ---Answers---according to the dept. Of energy, improved
energy codes could reduce co2 emissions by

300 sq ft. - ---Answers---attic insulation markers must be
installed every _____ square feet.

True. - ---Answers---buildings that are exempted from the new
regulations are those with very low energy use or ones that are
neither heated or cooled. T or f

Yes. - ---Answers---a contractor needs to remove a non-load
bearing wall, does he need to pull a permit?

No. - ---Answers---a concrete contractor has been hired by an
owner to install a driveway and sidewalks. The lot is flat and the
concrete is being place on undisturbed earth with a prepared
base. Does the contractor need to pull a permit?

Yes. - ---Answers---a permit has been issued for a building
project and there is a code infraction in the building plans that

,has been overlooked by the building official. Can the building
official require a correction to a project that they previously
overlooked?

Health department. - ---Answers---who issues a well and
septic permit?

200 sq. Feet.
Irc r105 - ---Answers---permits are not required for one story
detached accessory structures not exceeding:

The next business day. - ---Answers---if work requiring a
permit is provided in an emergency situation, the permit
application must be submitted within:

True. - ---Answers---if an inspection official is refused entry to
a building project, the official will have recourse to the remedies
provided by law which include securing a warrant from the court
and returning with an officer of the law.

No.
Irc r104.8 - ---Answers---can a building official be held liable
for any damage occurring to persons or property as a result of
their actions or inaction?

Yes. - ---Answers---an owner needs a foundation wall repaired,
it has seriously buckled due to excessive lateral loading from
soil pressure. Does the contractor need to pull a permit?

6 ft.
Irc r105.2 - ---Answers---although contractors should check for
restrictive covenants and local zoning requirements, a permit

,isn't required from the building official for installing a fence not
over _______ tall.

180 days. - ---Answers---if a permit is applied for but not yet
approved and the applicant is not persueing approval after______
days the application will be considered abandoned.

Yes. - ---Answers---can a building official revoke a certificate of
occupancy?

True. - ---Answers---when a project requiring a permit has
commenced prior to the issuance of a permit, the building official
is authorized to charge an additional fee. T or f

450 - ---Answers---foam plastic is used as insulation. The
flame spread index cannot exceed 75 and the smoke
development index cannot exceed

8". - ---Answers---foam plastic used for interior trim shall have
a maximum thickness of 1/2" and a maximum width of

10%. - ---Answers---foam plastic interior trim must not
constitute more than __________ of the total wall and ceiling area
of any room or space.

1/2". - ---Answers---foam plastic used as insulation in walls
must be separated by an approved thermal barrier. What is the
minimum thickness of gypsum wall board being used as a
thermal barrier for spray foam insulated walls?

Framing. - ---Answers---which of these inspections happens
last?
Mechanical rough

, plumbing rough
framing
electrical rough

Yes. - ---Answers---a retaining wall will be five feet tall from
the bottom of the footing to the top of the wall. Do you need to
pull a permit?

At the time of inspection. - ---Answers---your building is
utilizing engineered products such as engineered floor joists.
When do the installation instructions need to be available at the
work site?

1 3/8" solid wood
1 3/8" honeycomb core
20 minute fire rated
Any of the above - ---Answers---a door directly between a
garage and a residence shall never open directly into a sleeping
room. The door must also be

1 1/4" - ---Answers---the nosing for stairs shall not be less than
3/4" but not be more than

No. - ---Answers---a front porch is 25 inches above the grade
below. Are guards required to be installed?

False. - ---Answers---if a smoke alarm is in a bedroom, it
doesn't need to be right outside the bedroom also.

1/2" - ---Answers---if spray foam insulation is used to insulate a
wall, what is the minimum thickness of drywall needed to cover
the foam plastic?
$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Kylie6764
5.0
(1)

Conoce al vendedor

Seller avatar
Kylie6764 Johns Hopkins University School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4
Miembro desde
7 meses
Número de seguidores
0
Documentos
729
Última venta
3 semanas hace

Being a tutor, my focus is on offering reliable, accurate study materials to support the students in their exam preparation. Goal is providing best resources like nursing exam test banks, ensuring students shall buy with confidence. I encourage customers to leave reviews after purchases for quality assurance and to recommend my service to others. Thank you for your support and trust.

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes