100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

VA DEQ ESC INSPECTOR EXAM NEWEST 2025 ACTUAL EXAM| COMPLETE 200 REAL EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS/ ALREADY GRADED A+| VA DEQ ESC INSPECTOR EXAM REVIEW 2025 (BRAND NEW!!)

Puntuación
-
Vendido
-
Páginas
61
Grado
A+
Subido en
31-10-2025
Escrito en
2025/2026

VA DEQ ESC INSPECTOR EXAM NEWEST 2025 ACTUAL EXAM| COMPLETE 200 REAL EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS/ ALREADY GRADED A+| VA DEQ ESC INSPECTOR EXAM REVIEW 2025 (BRAND NEW!!)

Institución
VA DEQ ESC INSPECTOR
Grado
VA DEQ ESC INSPECTOR











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
VA DEQ ESC INSPECTOR
Grado
VA DEQ ESC INSPECTOR

Información del documento

Subido en
31 de octubre de 2025
Número de páginas
61
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Page 1 of 61


VA DEQ ESC INSPECTOR EXAM NEWEST 2025 ACTUAL
EXAM| COMPLETE 200 REAL EXAM QUESTIONS AND
CORRECT VERIFIED ANSWERS/ ALREADY GRADED A+| VA
DEQ ESC INSPECTOR EXAM REVIEW 2025 (BRAND NEW!!)




What is the lower limit of imperviousness which could result in stream
degradation? - ANSWER - 10%


If land disturbance occurs as a result of emergency work, what is the
timeline for advising the VSMP authority of the disturbance? -
ANSWER - within 7 days of commencing the LDA and a permit
application must be submitted within 30 days


DEQ is responsible for enforcing the ______ while locality _______ are
responsible for enforcing local ordinances. - ANSWER - Construction
GP, VSMP


BMPs use these three mechanisms to control pollution: - ANSWER -
Infiltration, settling, and vegetative uptake


How long does a locality VSMP authority have to determine the
completeness of a SWM plan? - ANSWER - 15 days




pg. 1

,Page 2 of 61


Every year, the locality VSMP must submit information to DEQ. When
is this due, and what info must be provided? - ANSWER - Due by Oct.
1, and must include: new types of SWM facilities, geographic
coordinates of them, acres treated, and surface waters/karst features into
which they discharge.


A locality VSMP must be at least as stringent as what state permit? -
ANSWER - The construction GP


What is the maximum penalty that may be imposed under the
stormwater management act? - ANSWER - $32,500


How long must a VSMP authority retain a registration statement? -
ANSWER - At least three years after project completion or state permit
termination.


How often must DEQ conduct program reviews? - ANSWER - DEQ
must complete a program review once every five years.


Where are the two locations where the notice of coverage letter must be
posted? - ANSWER - 1) onsite near the main entrance, and 2) in the
General information section of the SWPPP


What five things must be included in the general information section of
the SWPPP? - ANSWER - 1) signed copy of registration statement


pg. 2

,Page 3 of 61


2) copy of the notice of coverage letter
3) copy of the construction GP
4) narrative description of the construction activity
5) Legible site plans


What is the inspection frequency for a site's qualified personnel in areas
which have temporary stabilization? - ANSWER - Once a month


If a qualified personnel discovers an ESC practice is not functioning or
improperly installed, how long do they have to fix it? - ANSWER - No
longer than 7 days after discovery.


The operator must note all modifications or updates in the SWPPP,
including a record of the following three dates: - ANSWER - major
grading, stabilization, and any temporary or permanent ceasing of
construction activity.


How quickly must an unauthorized discharge to surface water be
reported to the DEQ? - ANSWER - Verbal notification within 24 hours,
written notification within 5 days


If an area is not at final grade, but may remain dormant for more than 14
days, how quickly must temporary stabilization be applied? - ANSWER
- Within 7 days



pg. 3

, Page 4 of 61


If a bare area is at final grade, when must permanent or temporary soil
stabilization be applied? - ANSWER - Within 7 days


Three requirements for concrete wash water: - ANSWER - 1) must be
directed to a leak-proof container or settling basin
2) container or basin cannot overflow
3) hardened or liquid concrete waste must be removed and properly
disposed.


How long must a VSMP authority maintain inspection reports? -
ANSWER - For at least three years after permit termination.


What legal agreement allows VSMP inspectors to access property for
conducting post-construction BMP inspections? - ANSWER - A long-
term maintenance agreement


Who must sign and seal a construction record drawing, and when must it
be submitted to the VSMP authority? - ANSWER - must be signed by a
professional registered in VA. Must be submitted before permit
termination.


How much time does the VSMP authority have to terminate any bonds
or securities provided by the operator? - ANSWER - Within 60 days of
completing the requirements of the permit conditions




pg. 4
$19.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ASSIGNMENT7 Walden University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
481
Miembro desde
1 año
Número de seguidores
19
Documentos
3015
Última venta
1 día hace
ACTUAL EXAMS, EXAM REVIEW AND STUDY GUIDE PLUG.

UNLOCK YOUR ACADEMIC SUCCESS, GAIN ACCESS TO EXPERTLY CRAFTED ACTUAL EXAMS, FLASHCARDS, TESTBANKS AND STUDY GUIDES ON THIS ACCOUNT, ELEVATE YOUR LEARNING EXPERIENCE AND ACHIEVE TOP GRADES WITH MY COMPREHENSIVE AND TIME SAVING RESOURCE. WISHING YOU GOOD LUCK IN YOUR EXAMS!!

4.0

94 reseñas

5
43
4
21
3
23
2
2
1
5

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes