100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

SADCW 6th Edition Quiz Questions and Answers – Complete Study Resource 2025

Puntuación
-
Vendido
-
Páginas
198
Grado
A+
Subido en
24-10-2025
Escrito en
2025/2026

Access the SADCW 6th Edition Quiz Questions and Answers, a comprehensive study resource for students and professionals seeking mastery of key course concepts. This updated 2025 edition includes chapter-by-chapter quizzes, multiple-choice questions, and detailed answer explanations designed to enhance understanding and reinforce learning. Ideal for classroom review, self-assessment, and exam preparation, this resource helps improve critical thinking, recall, and application of course material in academic and professional settings.SADCW 6th edition quiz questions, SADCW 6e study guide, quiz questions and answers PDF, SADCW exam review 2025, multiple choice quiz SADCW, chapter quizzes with answers, SADCW practice exam, SADCW course review questions, study resource 2025 SADCW, self-assessment quiz SADCW 6th edition

Mostrar más Leer menos
Institución
SADCW
Grado
SADCW











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
SADCW
Grado
SADCW

Información del documento

Subido en
24 de octubre de 2025
Número de páginas
198
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

SADCW-6ed Chapter 01: From Beginning to End: An Overview of Systems
Analysis and Design

TRUE/FALSE

1. An information system often includes the software, the database, and the related manual
processes.

ANS: T PTS: 1 REF: p4

2. Systems analysis is sometimes referred to as “understanding and specification.”

ANS: T PTS: 1 REF: p5

3. Systems design consists of activities to describe the solution to the problem.

ANS: T PTS: 1 REF: p5

4. A systems development project is always a formal activity with a beginning and an end.

ANS: F PTS: 1 REF: p5

5. The SDLC means the Systems Design Life Cycle.

ANS: F PTS: 1 REF: p6

6. Agile refers to the flexibility that programmers have in taking on various assignments.

ANS: F PTS: 1 REF: p6

7. Iterative development is the same as Agile development.

ANS: F PTS: 1 REF: p6, p8

8. In iterative development the system is grown organically.

ANS: T PTS: 1 REF: p8

9. The first core process is to plan the project.

ANS: F PTS: 1 REF: p8

10. In iterative development, an iteration usually lasts about six weeks. .

ANS: F PTS: 1 REF: p8

11. The System Vision Document is usually developed before the project actually begins.

ANS: T PTS: 1 REF: p10

,12. The project plan is required to get the project approved.

ANS: F PTS: 1 REF: p11

13. A Work Breakdown Structure is the first step in building a project schedule.

ANS: T PTS: 1 REF: p12

14. During analysis activities the project team build two types of diagrams: Use Case
diagram and Package diagram.

ANS: F PTS: 1 REF: p15-16

15. The purpose of a workflow diagram is to document the internal steps of a use case.

ANS: T PTS: 1 REF: p17

16. The ovals in a workflow diagram represent tasks.

ANS: T PTS: 1 REF: p17

17. The database is designed using information from the class diagram.

ANS: T PTS: 1 REF: p20

18. All the classes in the Design Class Diagram are used to define the database tables.

ANS: F PTS: 1 REF: p22

19. A package diagram is useful to document the various subsystems in a system.

ANS: T PTS: 1 REF: p22-23

20. Usually the final step in a given iteration is to deploy part of the system.

ANS: F PTS: 1 REF: p25

21. One approach to the SDLC can be described using five core processes.

ANS: F PTS: 1 REF: p6

22. An iteration normally only includes three or four of the core processes.

ANS: F PTS: 1 REF: p8

23. Sometimes the activities within Core Process one are completed before the actual project
starts.

ANS: T PTS: 1 REF: p9-10

,MULTIPLE CHOICE

1. An information system consists of
a. software, database, c. software, hardware,
and manual and database
processes
b. software, hardware, d. applications, screens,
and network and database
ANS: A PTS: 1 REF: p4

2. A person that functions as an architect to plan, capture the vision, and understand the
needs for a new system is often called a ____________________.
a. programmer analyst c. systems analyst
b. software engineer d. software developer
ANS: C PTS: 1 REF: p5

3. Those activities that enable a person to describe in the detail the system that solves the
need is called __________________.
a. architectural design c. systems analysis
b. systems design d. high-level design
ANS: B PTS: 1 REF: p5

4. SDLC stands for what?
a. Software Design Life c. Software
Cycle Development Life
Cycle
b. Systems Design Life d. Systems
Cycle Development Life
Cycle
ANS: D PTS: 1 REF: p6

5. An information system development process that emphasizes flexibility to embrace
change is called _____________________.
a. Iterative project c. Iterative development
planning
b. Adaptive d. Agile development
development projects
ANS: D PTS: 1 REF: p6

6. When a system is partitioned into pieces, each piece is referred to as a
_________________.
a. application c. subsystem

, b. package d. program
ANS: C PTS: 1 REF: 911

7. Two important goals or steps within Core Process one are ____ and _____.
a. identify the problem; c. describe the solution;
choose the project obtain project
manager approval
b. identify the solution d. estimate the cost;
objective; identify the iterations
obtain project
approval
ANS: B PTS: 1 REF: p10

8. Determine the major subsystems and assigning them to an iteration is done in which Core
Process?
a. 1 d. 4
b. 2 e. 5
c. 3 f. 6
ANS: B PTS: 1 REF: p11

9. Determining team members and assigning responsibilities is done in which Core Process?
a. 1 d. 4
b. 2 e. 5
c. 3 f. 6
ANS: B PTS: 1 REF: p11

10. Two of the primary elements that are included in a Work Breakdown Structure include:
a. subsystem iteration c. list of tasks and
assignments and assigned resources
estimated effort
b. sequence of tasks and d. list of tasks and
estimated effort estimated effort
ANS: D PTS: 1 REF: p12

11. The primary difference between a work breakdown structure and a work sequence draft is
that the work sequence draft shows ___________________.
a. the additionally c. the day to day
deployment tasks assignments
b. the estimated effort of d. the sequence of tasks
tasks
$14.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
completeguide

Conoce al vendedor

Seller avatar
completeguide Abraham Lincoln University, School Of Law
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
8
Miembro desde
4 meses
Número de seguidores
0
Documentos
113
Última venta
1 mes hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes