100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

VA DEQ SWM INSPECTOR FINAL EXAM TEST 2025/2026 BANK 2 VERSIONS CURRENTLY TESTING COMPLETE 500 QUESTIONS WITH DETAILED VERIFIED ANSWERS /ALREADY GRADED A+

Puntuación
-
Vendido
-
Páginas
44
Grado
A+
Subido en
16-10-2025
Escrito en
2025/2026

VA DEQ SWM INSPECTOR FINAL EXAM TEST 2025/2026 BANK 2 VERSIONS CURRENTLY TESTING COMPLETE 500 QUESTIONS WITH DETAILED VERIFIED ANSWERS /ALREADY GRADED A+

Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
16 de octubre de 2025
Número de páginas
44
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

1|Page




VA DEQ SWM INSPECTOR FINAL EXAM TEST 2025/2026
BANK 2 VERSIONS CURRENTLY TESTING COMPLETE 500
QUESTIONS WITH DETAILED VERIFIED ANSWERS
/ALREADY GRADED A+




VESCP - ANSWERS--Virginia Erosion and Sediment Control Program


- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED


Minimum Standard 1 - ANSWERS--Stabilization


permanent or temporary soil stabilization shall be applied to denuded
areas within seven days after final grade is reached on any portion of
the site; temporary soil stabilization shall be applied within seven days
to denuded areas that may not be at final grade but will remain
dormant for longer than 14 days; permanent stabilization shall be
applied to areas that are to be left dormant for more than one year


Site NOT at Final Grade - ANSWERS--- stabilize in 14 days
- temporarily seed
- mulch

,2|Page


- permanently stabilize if dormant > 1 year


Site at Final Grade - ANSWERS--- stabilize in 7 days (recommended
immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw


Minimum Standard 2 - ANSWERS--Stock Piles, Waste and Borrow Areas


during construction, soil stock piles and borrow areas shall be stabilized
or protected with sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact
and silt fence intercepts and detains from disturbed areas


Minimum Standard 3 - ANSWERS--Permanent Vegetation


permanent vegetation cover shall be established on denuded areas not
otherwise permanently stabilized (permanent vegetation shall not be
considered established until a ground cover is achieved that is uniform,
mature enough to survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from disturbed area

,3|Page




this is the standard used to verify that a site is ready for release of
bonds or surety


Minimum Standard 4 - ANSWERS--First-Step Measures


Sediment basins and traps, perimeter dikes, sediment barriers and
other measures intended to trap sediment shall be constructed as a
first step in any land-disturbing activity and shall be made functional
before upslope land disturbance takes place


a certain amount of initial land disturbance may be required to provide
access for equipment to install the perimeter controls, but site clearing
and grading should be kept to a minimum until the perimeter controls
are in place


intercepts and detains small amounts of sediment from disturbed areas
during construction operation to prevent sediment from leaving the
site and decrease velocity of sheet flows and low-to-moderate level
channel flow


Perimeter Controls - ANSWERS--assures that sediment does not leave
the perimeter of the land-disturbing area once site clearing, grading,
and construction commences

, 4|Page


Examples: silt fences, sediment traps, sediment basins, construction
entrance, temporary diversions, diversions


Minimum Standard 5 - ANSWERS--Earthen Structure Stabilization


stabilization measures shall be applied to earthen structures such as
dams, dikes, and diversions immediately after installation


reduce erosion and sedimentation and reduce damage from sediment
and runoff to downstream or off-site areas


Minimum Standard 6 - ANSWERS--Traps and Basins


sediment traps and basins shall be designed and constructed based
upon the total drainage area (not just disturbed area) to be served by
the trap or basin


Sediment Traps - ANSWERS--minimum storage capacity shall be 134
cubic yards per acre of drainage area and shall only control drainage
areas less than 3 acres


*stone outlet = trap*
$34.72
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
wambuimorgan041

Conoce al vendedor

Seller avatar
wambuimorgan041 education to the exccelence
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
4 meses
Número de seguidores
0
Documentos
460
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes