How long does a locality VSMP authority have to determine the completeness of a SWM plan?
15 days
Every year, the locality VSMP must submit information to DEQ. When is this due, and what info
must be provided?
Due by Oct. 1, and must include: new types of SWM facilities, geographic coordinates of them,
acres treated, and surface waters/karst features into which they discharge.
A locality VSMP must be at least as stringent as what state permit?
The construction GP
What is the maximum penalty that may be imposed under the stormwater management act?
$32,500
How long must a VSMP authority retain a registration statement?
At least three years after project completion or state permit termination.
How often must DEQ conduct program reviews?
DEQ must complete a program review once every five years.
Where are the two locations where the notice of coverage letter must be posted?
1) onsite near the main entrance, and 2) in the General information section of the SWPPP
1|Page
, What five things must be included in the general information section of the SWPPP?
1) signed copy of registration statement
2) copy of the notice of coverage letter
3) copy of the construction GP
4) narrative description of the construction activity
5) Legible site plans
What is the inspection frequency for a site's qualified personnel in areas which have temporary
stabilization?
Once a month
If a qualified personnel discovers an ESC practice is not functioning or improperly installed, how
long do they have to fix it?
No longer than 7 days after discovery.
The operator must note all modifications or updates in the SWPPP, including a record of the
following three dates:
major grading, stabilization, and any temporary or permanent ceasing of construction activity.
How quickly must an unauthorized discharge to surface water be reported to the DEQ?
Verbal notification within 24 hours, written notification within 5 days
If an area is not at final grade, but may remain dormant for more than 14 days, how quickly
must temporary stabilization be applied?
Within 7 days
If a bare area is at final grade, when must permanent or temporary soil stabilization be applied?
Within 7 days
Three requirements for concrete wash water:
1) must be directed to a leak-proof container or settling basin
2) container or basin cannot overflow
3) hardened or liquid concrete waste must be removed and properly disposed.
How long must a VSMP authority maintain inspection reports?
For at least three years after permit termination.