100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

SOWK 1350 Exam 1 Review Final Exam Questions and Graded Answers, 100 % Guaranteed

Puntuación
-
Vendido
-
Páginas
29
Grado
A+
Subido en
10-10-2025
Escrito en
2025/2026

SOWK 1350 Exam 1 Review Final Exam Questions and Graded Answers, 100 % Guaranteed

Institución
SOWK 1350
Grado
SOWK 1350










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
SOWK 1350
Grado
SOWK 1350

Información del documento

Subido en
10 de octubre de 2025
Número de páginas
29
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

MSSC Maintenance test 1 Questions and Graded Answers, 100 %
Guaranteed
What is an accelerometer used for?
- Temperature measurement
- Acoustic monitoring
- Vibration measurement

- Oil analysis - ✔✔Vibration measurement


Corrective work is performed following preventive maintenance when __________.
- The schedule calls for it
- The supervisor requests it
- The PM work was performed incorrectly

- Problems are discovered - ✔✔Problems are discovered


Slips and falls are the worst safety hazards when __________.
- Cleaning fans
- Mopping floors
- Lifting heavy objects

- Driving a tug - ✔✔Mopping floors


Supply errors can be caused by relying on __________ without monitoring their
performance.
- Customers
- Employees
- Suppliers

- Inspectors - ✔✔Suppliers


Preventive maintenance is best described as what?
- Periodic in nature
- Exhausting

,- Breakdown repair

- Flexible - ✔✔Periodic in nature


A board with tool outlines for placement is called a __________ and is a good way to make
sure tools are returned to their proper storage space between uses.
- Storyboard
- Shadow board
- Board of tools

- Storage bin - ✔✔Shadow board


The frequency of maintenance is usually an item found on the __________.
- Preventive maintenance schedule
- Work order
- Warranty card

- Hold card - ✔✔Preventive maintenance schedule


A maintenance technician should arrange to have all routine tools and supplies ready to
perform preventive maintenance on a machine in order to __________.
- Increase equipment downtime
- Minimize equipment downtime
- Make sure that the job is done correctly

- Make sure that the machine parts are still available - ✔✔Minimize equipment downtime


Placing tools and equipment where they can be reached with minimal strain is a characteristic
of a __________.
- Poorly designed workstation
- Well-designed workstation
- Old style workstation

- Pull system - ✔✔Well-designed workstation


What can be done after a corrective action form is completed?

, - The form is saved in a safe and secure place.
- The maintenance technician reviews the work order.
- The supervisor is summoned to determine whether the job is complete.

- Preventive maintenance should be documented as completed. - ✔✔Preventive maintenance
should be documented as completed.


The first thing an employee should do when discovering a building maintenance issue that
negatively impacts his/her work area is __________.
- Report the situation to the supervisor
- Try to fix the problem
- Go home until the problem is fixed

- Ignore the problem - ✔✔Report the situation to the supervisor


How often the maintenance will occur is the primary consideration of what type of
maintenance?
- Predictive
- Reactive
- Responsive

- Preventive - ✔✔Preventive


Reactive Maintenance is considered a(n) __________ activity.
- Unplanned maintenance
- Planned maintenance
- Highly responsive maintenance

- Chemical-related maintenance - ✔✔Unplanned maintenance


In a well-organized plant, it should take a worker __________ to find the right tool.
- 30 seconds
- 1 minute
- 5 minutes

- 10 minutes - ✔✔30 seconds
$3.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
BrainBox2025

Conoce al vendedor

Seller avatar
BrainBox2025 EXAMS
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
Nuevo en Stuvia
Miembro desde
2 meses
Número de seguidores
0
Documentos
38
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes