100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

NICET FIRE ALARM INSIGHTFUL LEVEL 2 EXAM WITH REVISION QUESTIONS AND CORRECT ANSWERS| VERIFIED

Puntuación
-
Vendido
-
Páginas
105
Grado
A+
Subido en
22-09-2025
Escrito en
2025/2026

NICET FIRE ALARM INSIGHTFUL LEVEL 2 EXAM WITH REVISION QUESTIONS AND CORRECT ANSWERS| VERIFIED Smoke detectors should be installed only after construction cleanup. There is no exception at all. - Answer FALSE. Smoke detectors should be installed only after construction cleanup EXCEPT for protection during construction What is an Addressable Device? - Answer It is a fire alarm system component that possesses discreet identification. A __________ can transmit a signal that indicates on off condition only. - Answer 3.3.132.1 Conventional Initiating Device __________ is a feature that can reduce unwanted alarms. - Answer 3.3.16 Alarm verification Fire alarms from an auxiliary system are always received at: - Answer Fire alarms from an auxiliary system are always received at the public fire service communication center. Auxiliary Fire Alarm System is connected to: - Answer Auxiliary Fire Alarm System is connected to a municipal fire alarm system. Municipal fire alarm system - Answer A public emergency alarm reporting system Auxiliary Fire Alarm System - Answer A protected premises fire alarm system or other emergency system at the protected premises and the system used to connected the protected premises system to a public emergency alarm reporting system for transmitting an alarm to the communications center. __________ Detector has a piping distribution network to the areas being protected. Air Sampling-Type detector uses a fan inside its housing to draw air. - Answer 3.3.66.1 Air sampling-type An _________ that transmits a signal indicating varying degrees of condition - Answer 3.3.132.1 Analog Initiating Device You need to request NFPA to certify your installations. True? - Answer Not true. The NFPA does not certify any installations. AHJ is responsible for approving installations. An AHJ is responsible for: - Answer An Authority Having Jurisdiction is responsible for approving an installation. What is an Annunciator? - Answer An Annunciator has multiple indicator lamps, alphanumeric displays... etc... to show status information of a circuits condition. A __________ Fire Alarm Box requires that you break a special element so to gain access to and operate the box. - Answer A Breakglass Fire Alarm Box requires that you break a special element so to gain access to and operate the box. What does Compatibility Listed mean? - Answer Compatibility Listed is a specific listing process that applies to TWO WIRE DEVICES only. Combination Detector - Answer Combination Detector can respond to multiple fire phenomenon. Equipment is LISTED - Answer The equipment is included in a list publish by an organization which is acceptable to the "AHJ" With a "non-restorable" initiating device: - Answer the sensing element will be DESTROYED during the process of operation What is a pull station? - Answer PULL STATION is a manually operated device which may be used to initiate an alarm signal. Describe NRTL: - Answer It is the Nationally Recognized Testing Laboratory that is recognized by the OSHA as meeting the qualifications specified in the Code of Federal Regulations. CODE - Answer Code are written rules that are adopted as law. What give the details on how the requirement of the code may be achieved? - Answer STANDARDS give the details on how the requirement of the code may be achieved. NFPA 72 recommends that the coverage area for a single zone should not exceed __________ square feet. - Answer 20,000 square feet NFPA 72 recommends that the coverage area for a single zone should not extend beyond a floor of a building. - Answer TRUE At the max you can have _____ waterflow switches and _____ supervisory switches connected to a single zone. - Answer At the max you can have 5 waterflow switches and 20 supervisory switches connected to a single zone. When you place smoke and heat detector on a peaked ceiling, you should measure _____ feet horizontally from the peak in both directions. - Answer When you place smoke and heat detector on a peaked ceiling, you should measure 3 feet horizontally from the peak in both directions. When you install smoke detectors under raised floors: - Answer the detectors SHOULD be mounted in an orientation in which they are listed. . The exact requirements for the location of pull stations within a building are dictated by: - Answer BUILDING CODE When deploying pull stations, they must be installed according to: - Answer NFPA 72 Talking about Sprinkler Waterflow Alarm-Initiating Device, activation should take place within _____ seconds of waterflow at the device. - Answer 90 seconds Manual fire alarm boxes should be installed in a manner which is: - Answer 17.14.8.2 conspicuous, unobstructed, and accessible In existing residential dwellings, you should have at least _____ detectors installed per floor. - Answer one (1) detector PER floor In some local jurisdictions you may consider to use heat detectors in place of smoke detectors only when: - Answer conditions are NOT favorable for smoke detection A Digital Alarm Communicator Receiver cannot accept and display signals sent from the digital alarm communicator transmitters over the public switched telephone network. True? - Answer FALSE. A Digital Alarm Communicator Receiver can accept and display signals sent from the digital alarm communicator transmitters over the public switched telephone network. An EOL relay device can supervise power for: - Answer An EOL relay device can supervise power for 4-wire smoke detectors. The Digital Alarm Communicator Transmitter is always located at: - Answer the protected premises An EOL device is always placed at the end of __________ for maintaining supervision. - Answer a class B circuit The Fire Alarm Control Panel should not be configured to supply power to detection devices. - Answer FALSE. The fire alarm control panel may supply power to the detection devices. It may be a local unit or master control unit. What ratings indicate in hours the ability of a structure to withstand fire? - Answer FIRE RATINGS Codes are the minimums that must be complied with. True? - Answer TRUE...

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Grado

Información del documento

Subido en
22 de septiembre de 2025
Número de páginas
105
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NICET FIRE ALARM INSIGHTFUL
LEVEL 2 EXAM 2025\2026 WITH
REVISION QUESTIONS AND CORRECT
ANSWERS| VERIFIED

Smoke detectors should be installed only after construction cleanup. There is no
exception at all. - Answer FALSE. Smoke detectors should be installed only after
construction cleanup EXCEPT for protection during construction
What is an Addressable Device? - Answer It is a fire alarm system component that
possesses discreet identification.




A __________ can transmit a signal that indicates on off condition only. - Answer
3.3.132.1 Conventional Initiating Device


__________ is a feature that can reduce unwanted alarms. - Answer 3.3.16 Alarm
verification


Fire alarms from an auxiliary system are always received at: - Answer Fire alarms
from an auxiliary system are always received at the public fire service
communication center.


Auxiliary Fire Alarm System is connected to: - Answer Auxiliary Fire Alarm
System is connected to a municipal fire alarm system.

,Municipal fire alarm system - Answer A public emergency alarm reporting system


Auxiliary Fire Alarm System - Answer A protected premises fire alarm system or
other emergency system at the protected premises and the system used to
connected the protected premises system to a public emergency alarm reporting
system for transmitting an alarm to the communications center.


__________ Detector has a piping distribution network to the areas being
protected. Air Sampling-Type detector uses a fan inside its housing to draw air. -
Answer 3.3.66.1 Air sampling-type


An _________
that transmits a signal indicating varying degrees of condition - Answer 3.3.132.1
Analog Initiating Device


You need to request NFPA to certify your installations. True? - Answer Not true.
The NFPA does not certify any installations. AHJ is responsible for approving
installations.


An AHJ is responsible for: - Answer An Authority Having Jurisdiction is
responsible for approving an installation.


What is an Annunciator? - Answer An Annunciator has multiple indicator lamps,
alphanumeric displays... etc... to show status information of a circuits condition.


A __________ Fire Alarm Box requires that you break a special element so to gain
access to and operate the box. - Answer A Breakglass Fire Alarm Box requires that
you break a special element so to gain access to and operate the box.

, What does Compatibility Listed mean? - Answer Compatibility Listed is a specific
listing process that applies to TWO WIRE DEVICES only.


Combination Detector - Answer Combination Detector can respond to multiple
fire phenomenon.


Equipment is LISTED - Answer The equipment is included in a list publish by an
organization which is acceptable to the "AHJ"


With a "non-restorable" initiating device: - Answer the sensing element will be
DESTROYED during the process of operation


What is a pull station? - Answer PULL STATION is a manually operated device
which may be used to initiate an alarm signal.


Describe NRTL: - Answer It is the Nationally Recognized Testing Laboratory that
is recognized by the OSHA as meeting the qualifications specified in the Code of
Federal Regulations.


CODE - Answer Code are written rules that are adopted as law.


What give the details on how the requirement of the code may be achieved? -
Answer STANDARDS give the details on how the requirement of the code may be
achieved.

, NFPA 72 recommends that the coverage area for a single zone should not exceed
__________ square feet. - Answer 20,000 square feet


NFPA 72 recommends that the coverage area for a single zone should not extend
beyond a floor of a building. - Answer TRUE


At the max you can have _____ waterflow switches and _____ supervisory
switches connected to a single zone. - Answer At the max you can have 5
waterflow switches and 20 supervisory switches connected to a single zone.


When you place smoke and heat detector on a peaked ceiling, you should measure
_____ feet horizontally from the peak in both directions. - Answer When you place
smoke and heat detector on a peaked ceiling, you should measure 3 feet
horizontally from the peak in both directions.


When you install smoke detectors under raised floors: - Answer the detectors
SHOULD be mounted in an orientation in which they are listed.


.


The exact requirements for the location of pull stations within a building are
dictated by: - Answer BUILDING CODE


When deploying pull stations, they must be installed according to: - Answer NFPA
72


Talking about Sprinkler Waterflow Alarm-Initiating Device, activation should take
place within _____ seconds of waterflow at the device. - Answer 90 seconds
$10.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
mutindampatrick12

Conoce al vendedor

Seller avatar
mutindampatrick12 Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
4 meses
Número de seguidores
0
Documentos
41
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes