A locality VSMP should be as stringent as what country permit? - ANS-The Construction GP
Discuss how the charge of runoff modifications after development: - ANS-The price of runoff
will increase after improvement because of the substitute of plant life with impervious
surfaces. A larger volume of water will travel greater quick through a movement channel,
doubtlessly inflicting erosion and flooding.
Does the stormwater control plan address runoff throughout creation or after? - ANS-The
stormwater management plan addresses submit-creation stormwater runoff.
Does the SWPPP have to contain control measures for support hobby areas? - ANS-Yes, if
the guide hobby is covered underneath the development GP, the SWPPP need to consist of
manipulate measures for the aid interest regions.
How often have to a VSMP authority inspect a creation site? - ANS-Periodically
How long have to a locality VSMP maintain directly to a registration assertion? - ANS-All
registration statements ought to be documented and retained for at the least 3 years from
the date of venture crowning glory or kingdom permit termination.
How long must a VSMP authority preserve inspection reports? - ANS-Three years after
permit termination
How often need to DEQ behavior program overview? - ANS-Once each 5 years.
How fast should an operator file an unauthorized discharge into or upon surface waters or
which can moderately be expected to go into floor waters? - ANS-The operator need to
notify DEQ right now upon discovery of the release, but in no case later than within 24 hours
of discovery. A written file of the unauthorized discharge should be submitted to DEQ and
the VSMP authority inside five days of discovery.
IF the qualified personnel discover an erosion and sediment manipulate exercise that
become now not properly installed, how lengthy do they need to repair it? - ANS-As quickly
as viable however no later than seven days after discovery or a longer duration as approved
with the aid of the VSMP authority.
List 3 violations for which a penalty may be imposed. - ANS-Any of the subsequent: No
kingdom registration announcement; no SWPPP; incomplete SWPPP; SWPPP now not to
be had for assessment; no accredited ESC plan; failure to install stormwater control BMPs or
ESCs; stormwater BMPs or erosion and sediment controls improperly mounted or
maintained; operational deficiencies; failure to conduct required inspections; incomplete,
flawed, or neglected inspections.