VA DEQ ESC Inspector Exam NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Institución
SWM DEQ
Grado
SWM DEQ










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
SWM DEQ
Grado
SWM DEQ

Información del documento

Subido en
10 de septiembre de 2025
Número de páginas
20
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

VA DEQ ESC Inspector Exam


1st Line of Defense - ANS-Vegetative Eroision Control

- inexpesive
- smooth to put in

2d Line of Defense - ANS-Structural Sediment Control

- pricey
- Requires Maintenance

800 Hour Work Experience Form - ANS-individuals with at the least 800 hours of on-the-job
paintings revel in as a stormwater management application administrator, inspector, plan
reviewer, or combined administrator may also entire the form on the DEQ internet site as
opposed to finishing the DEQ education guides

*nevertheless ought to pass the examination

9VAC25-840-80 - ANS-Criteria for figuring out status of land-disturbing activity

A. Program administrator shall decide the validity of a claim of exempt status with the aid of
a property owner who disturbs 10,000 sf or extra or 2,500 sf or extra in all areas of
jurisdictions certain as difficulty to the Chesapeake Bay Preservation Area Designation and
Management Regulations (9VAC25-830); as soon as nonexempt repute is determined, the
requirements of the Act shall be without delay enforced.

B. Have to a land-demanding interest no longer start for the duration of the one hundred
eighty-day period following plan approval or give up for more than one hundred eighty days,
the VESCP authority may evaluate the present authorized erosion and sediment manipulate
plan to determine whether the plan nevertheless satisfies nearby and nation erosion and
sediment manage standards and to verify that each one layout factors are nonetheless valid;
if VESCP authority locate the formerly filed plan to be inadequate, a changed plan shall be
submitted and accepted previous to the resumption of land-annoying hobby (no
grand-fathering in erosion)

Activities Exempt from LDA Regulations - ANS-- minor land-disturbing sports inclusive of
domestic gardens/landscaping, domestic repairs and renovation

- person provider connections

,- set up, renovation, or restore of any underground public software traces whilst such activity
occurrs on existing hard surfaced street, road, or sidewalk, provided the LDA is confined to
the area of the road, street, or sidewalk that is hard surfaced

- Septic tank lines or discharge fields except protected in an overall plan for LDA relating to
creation of the building to be served by using the septic tank device

- planting plants, making feedlots

- railroad shit

- emergencies!!! Wee-wooo-wee-woo

Adequate ESC Plan MUST - ANS-- meet requirements of ESC laws and policies
- statisfy minimum standards of the VA ESC Regs
- comply with more stringent standards required by way of the locality
- encompass the applicable specifications from the ESC Handbook (titled and numbered)
- contain sufficient information to guarantee the plan-approving authority that ability issues of
erosion and sedimentation were appropriately addressed
- consist of a plan evaluate checklist as required by way of the locality

Annual Standards and Specifications - ANS-Entities that perform a signficant quantity of
LDAs can document with DEQ a general ESC standards and specs to define how all LDAs
might be carried out.

- Linear Ventures (electric powered, herbal fuel, cellphone, and many others.), interstate and
intrastate pipeline, and railroad organizations are MUST put up requirements and
specifications to DEQ.

- Federal entities (water, sewer, etc.) MAY put up requirements and specs to DEQ

- Standards and specifications must be steady with the ESC and SWM regulation and rules.

- Must be fiked ANNUALLY and DEQ has 60 DAYS to comment

Approved ESC Plan - ANS-- Before ANY AGENCY can issue constructing or different
permits for sports regarding LDAs, regulated by means of the ESC legal guidelines, the
applicant should encompass an accredited ESC plan and certification that the plan might be
followed.

- Approval is given by way of VESCP authority

- If also subject to SWM Act, this plan should also be authorized and included earlier than
LDAs can begin (approval from VSMP authority)

Can you re-certify within the ultimate 365 days with out dropping the time of your
certification? - ANS-Yes, time will be brought on your certification

, you need 18 touch hours in 3 years

Channel Erosion - ANS-can occur in ways; usually you may study vertical sides and
down-cutting of the receiving channel

1. When gullies aren't repaired in time and large volumes of water increase the scale of the
gully

2. In existing streams or drainage ways while the extent and pace of glide destroys the
structural integrity of stream beds and banks

Circumstances for Issuing a Stop Work Order - ANS-1. Failure to conform with an ESC plan
(documented by inspection reviews), accompanied by issuance of note to comply, and then
failure to implement corrective measures with the aid of deadline

2. LDA started out without accredited ESC plan or required permits

three. Alledged noncompliance is inflicting or is ready to cause harmful erosion of lands or
sediment deposition in waters inside the watersheds of the commonwealth

Climate - ANS-precipitation kind; rainfall intensity and raindrop size; snow soften; and
temperature extremes (freezing, excessive heat)

Combined Administrator - ANS-anyone who's chargeable for acting the blended obligations
of program adminstrator, plan reviewer and challenge inspector of a VESCP authority

Common Bulk Density Measurements - ANS-- undisturbed lands wooded area and
woodlands = 0 1.03 g/cc
- residential neighborhoods - 1.Sixty nine to one.97 g/cc
- golfing courses/parks athletic fields = 1.Sixty nine to at least one.Ninety seven g/cc
- concrete = 2.2 g/cc

Concave slopes - ANS-slopes which flatten at the lower give up

commonly herbal

Concentrated Flow - ANS-A result of the intensity of sheet flow and irregularities in the soil
surface (low spots, depressions, rocks, plant stems, roots, and so forth.).

Runoff starts offevolved in tiny rills and then expands into massive gullies, aquiring extra
electricity to detach and delivery soil debris.

> water quantity = > speed and turbulence = > soil dislodged

Suspended soil particles strike and abrade the soils surface like sandpaper, causing greater
soil particles to detach and mobilize, in addition growing abrasive force.
$15.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Qualityexam Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
60
Miembro desde
1 año
Número de seguidores
2
Documentos
1104
Última venta
19 horas hace

Welcome To my Store My Goal is to help you achieve your desired grades by providing credible study materials I'm happy to help you with quality documents On this page you will find quality study guides,Exams assignments, Research papers and Test Banks all verified correct . you'll find past and recent revised and verified study materials . Stay here and You'll find everything you need to pass !!! . I always ensure my documents are of high standards Be assured to get good grades and always leave a review after a purchase Refer a friend SUCCESS!!!!

Lee mas Leer menos
4.1

15 reseñas

5
9
4
1
3
3
2
1
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes