ICC Vapor Recovery 1 and 2 Combined Exams (Actual 2025/2026) Questions with complete solutions| Graded A+
ICC Vapor Recovery 1 and 2 Combined Exams (Actual 2025/2026) Questions with complete solutions| Graded A+ ICC Vapor Recovery 1 Which of the following is not considered "hanging hardware"? a. nozzle b. swivel c. whip hose d. shear valve d. shear valve Per Executive Order. VR-201-E, if the dispensing vacuum of the Healy VP-1000 pump is below ____ inches of WC, the dispenser should be removed from service. A. 50 B. 60 C. 75 D. 100 B. 60 In a coaxial hose for a balance system, the product flows through the ____? A. the belllows B. the inner hose C. the outer hose D. both hoses B. the inner hose