100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PRM3701 ASSESSMENT 1 SEMESTER 2 2025 A test engineer is to conduct environmental testing but the chamber cannot hold all the equipment that needs to be tested. This is an example of a constraint that could impact the sequence and timing of activities

Puntuación
-
Vendido
-
Páginas
172
Grado
A+
Subido en
01-09-2025
Escrito en
2025/2026

PRM3701 ASSESSMENT 1 SEMESTER 2 2025 A test engineer is to conduct environmental testing but the chamber cannot hold all the equipment that needs to be tested. This is an example of a constraint that could impact the sequence and timing of activities in a project network. What type of constraint is it? a. Physical b. Technical c. Resource d. Scheduling e. Time The risk associated with the unlikelihood that one of the key members will be struck by lightning would most likely be handled by which of the following? a. Mitigating b. Retaining  c. Escalating d. Transferring e. Avoiding

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
1 de septiembre de 2025
Número de páginas
172
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PU E
SHI
NG Y L E NC
OU TO THE GATE OF EXC EL




Education is the most powerful weapon which you can use to change the world

,WARNING: PLEASE NOTE THAT PLAGIARISM IS A SERIOUS ACADEMIC
OFFENSE, therefore students must use this document ONLY as a guideline. Hence
students have regenerated their own (personalized) solutions paying particular
attention to module contents as prescribed by module facilitators, lecturers and
supervisors. This document’s purpose is to compact all sources of information that
might be relevant to students’ assignments, hence additional knowledge on the
provided information is not restricted by the authors. However, submitting this
document as one’s final work is considered unethical, and students should be
penalized. If this document is plagiarized by the users and fails, EXCELGATE should
not be rendered accountable since the contents in this document only give learners a
kick-start on what is expected of them from their areas of specialty.

CAUTION: STUDENTS ARE NOT MANDATED TO USE EVERY DETAIL IN THIS
DOCUMENT IN WRITING THEIR ASSIGNMENTS




Education is the most powerful weapon which you can use to change the world

,EXCELCENTRE
8/14/24, 8:17 PM
INSTITUTE Assessment 1: Attempt review




PRM3701-24-S2  Welcome Message  Assessment 1

QUIZ




Started on Friday, 2 August 2024, 9:30 AM
State Finished
Completed on Friday, 2 August 2024, 10:58 AM
Time taken 1 hour 27 mins
Marks 12.00/15.00
Grade 80.00 out of 100.00


Question 1
Complete

Mark 1.00 out of 1.00




The project life cycle sequentially passes through four stages. The starting point begins the moment the project is given a go
ahead. Match the stages below according to their correct explanation.


Defining Major responsibilities are assigned

Planning What will the budget be

Executing The physical product is produced

Closing Post-project review




Please consult LO 1-3 in your textbook for detailed feedback




https://mymodules.dtls.unisa.ac.za/mod/quiz/review.php?attempt=20509032&cmid=941679 1/8

, EXCELCENTRE
8/14/24, 8:17 PM
INSTITUTE Assessment 1: Attempt review

Question 2

Complete

Mark 1.00 out of 1.00




Which dimension of project management centers on creating a temporary social system within a larger organizational
environment that combines the talents of a divergent set of professionals working to complete the project?



Select one:
a. Communication

b. Sociocultural

c. Social

d. Technical

e. Scheduling




The second and opposing dimension is the sociocultural side of project management. In contrast to the orderly world of
project planning, this dimension involves the much messier, often contradictory and paradoxical world of implementation.
It centers on creating a temporary social system within a larger organizational environment that combines the talents of a
divergent set of professionals working to complete the project.




Question 3

Complete

Mark 1.00 out of 1.00




You have been the project manager for the building a new bridge. In which stage of the project life cycle are you more likely to
find status reports, changes, and the creation of forecasts?


a. Identifying

b. Defining

c. Planning

d. Executing

e. Closing




You are more likely to find status reports, changes and the creation of forecasts in the executing stage of project life cycle.
L01-03




https://mymodules.dtls.unisa.ac.za/mod/quiz/review.php?attempt=20509032&cmid=941679 2/8
$3.05
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
excelgateinstitute Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
754
Miembro desde
1 año
Número de seguidores
36
Documentos
692
Última venta
13 horas hace
EXCEL CENTRE

4.0

116 reseñas

5
60
4
18
3
27
2
5
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes