100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025/2026 WITH ACTUAL QUESTIONS AND WELL DETAILED ANSWERS/ALREADY GRADED A+

Puntuación
-
Vendido
-
Páginas
35
Grado
A+
Subido en
08-08-2025
Escrito en
2025/2026

ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025/2026 WITH ACTUAL QUESTIONS AND WELL DETAILED ANSWERS/ALREADY GRADED A+

Institución
ICC CALIFORNIA UST
Grado
ICC CALIFORNIA UST











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ICC CALIFORNIA UST
Grado
ICC CALIFORNIA UST

Información del documento

Subido en
8 de agosto de 2025
Número de páginas
35
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM
NEWEST 2025/2026 WITH ACTUAL QUESTIONS AND
WELL DETAILED ANSWERS/ALREADY GRADED A+

UDC was required at time of installation for all systems installed after?

January 1, 2000

July 1, 2005, service techs shall possess or work under someone who has a

current certification indicating he or she has passed the?

ICC UST Service Technician Exam

ICC cert must be renewed every?

24 months

Service techs must possess or be employed by a person who has the appropriate

contractor's license unless?

The individual has a tank testing license

Service tech is defined by any individual who?

Tests UST monitoring equipment, trouble shoots UST systems, and/or installs UST

monitoring equipment.

If the manufacturer training no longer exist, the local agency may?

Approve comparable alternate training .

UST includes?

Tank and connected piping

What is considered a UST?

A petroleum storage tank.

What UST system meets the requirements for secondary containment?

,Doubled wall tanks

According to title 23; the following piping components if installed after July 1,

1987 must have secondary containment.

Pressured product piping

Considered "pipe" on tanks installed after July 1, 2003.

Pressured product piping and below ground vapor recovery.

Under dispenser containment (UDC) was required for all existing UST systems by

December 31, 2003

System for exchanging gas vapors in a storage tank and product in a fuel delivery

truck

Stage 1 vapor recovery

An approved method for non-visual monitoring for existing UST systems.

Statistical Inventory Reconciliation (SIR)

ATG must be capable for detecting a release of?

0.2 gallons per hour

What is no longer an approved method for non-visual monitoring on existing UST

systems?

Manual inventory reconciliation.

Automatic line leak detectors installed on underground piping with secondary

containment shall be capable of detecting a leak of ?

3 gallons per hour at 10 psi

How often should ATG be programmed to test the tank?

At least monthly

,According to PEI RP 300, a combustible gas can be used to?

Detect vapor leaks in a vapor recovery system.

According to PEI RP 300, a written scope of work for vapor recovery installation

should include?

Construction plans

Positive shut off overfill protection device must stop the flow of fuel when the

tank is no more then?

95% full

According to Executive Order (EO) VR 201-A , what could cause a nozzle shut off

mechanism or malfunction?

Depended filter seal damage

According to VR 201-A, breakaway reconnection must be?

Logged in GDF log

According to PEI RP 300 what is an INCORRECT method of documenting piping

location?

Sketching a diagram on the inside cover of vapor recovery equipment manual

According to PEI RP 300 as built drawing or pictures of the underground pipping

and other components shall be_________.

maintained as long as UST is in service.

According to EO VR 101-E maintenance records are required to include what?

Name and Designated UST Operator.

The Phil-Tite EVR Phase 1 system require that vapor vent pipes at any UST

system be

, Used with no more than 3 p/v valves

According to EO VR 2010 after installing a new spout assembly in the Healy 900

nozzle the following test must be conducted?

Nozzle dispensing shut off test

According to Healy EO VR 201-A a vapor recovery record is to be maintained by?

Gasoline dispensing facility operator(GDF)

An enhanced leak detection test is required within how many feet of a public

drinking well?

1000 feet

What are the components of the Fire Triangle?

Fuel, Heat/Ignition Source, Oxygen

If equipped with an over fill alarm, it must be located?

So it can be seen or heard from the delivery location.

If installed, the following requires independent 3rd party certification to prove

compliance with established regulations.

Automatic Tank Gauge, Liquid Product Detectors, SIR

Where are ATG's installed?

Opening in top of the tank

What is true about ATG's

They're capable of alarming operator of low product level

The following types of releases must be reported to the local agency.
$22.48
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ExamSuccessHub Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
178
Miembro desde
1 año
Número de seguidores
5
Documentos
2212
Última venta
12 horas hace

4.1

9 reseñas

5
5
4
2
3
1
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes