EXAM WITH COMPLETE 130 QUESTIONS AND CORRECT
DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY
GRADED A+ | GUARANTEED PASS
What is one benefit of constant customer feedback?
A) Fast learning cycles
B) It reduces the need for face-to-face collaboration
C) Teams can better align working days with a customer's schedule
D) It reduces the amount of changes to the Features - Correct Answer > A) Fast
learning cycles
Which statement describes the Scaled Agile Framework?
A) It scales Scrum to multiple Agile Teams
B) It provides guidelines for Project Managers
C) It provides strict guidelines for all daily activities
D) It synchronizes alignment, collaboration, and delivery for large
numbers of teams - Correct Answer > D) It synchronizes alignment,
collaboration, and delivery for large numbers of teams
,The Work-in-Process limit at the Analyzing step of the ART Kanban is
based on the overall availability of Product Management, other subject
matter experts, and the capacity of which two other roles? (Choose
two.)
A) Lean Agile Center of Excellence
B) Release Train Engineer
C) Business Owners
D) System Architects
E) Agile Portfolio Operations - Correct Answer > C) Business Owners
D) System Architects
Features in ART Backlogs can result from what?
A) Decomposing Enabler Stories
B) Splitting Epics or Capabilities
C) Aggregating stories into Features
D) Refining the Team Backlog - Correct Answer > B) Splitting Epics or
Capabilities
Which statement is true about fast feedback?
A) It supports SAFe Lean-Agile Principle #3 - Assume variability, preserve
options
B) The shorter the feedback cycle, the higher the utilization
,C) It accelerates planning and delivery
D) Smaller batch sizes enable faster feedback loops - Correct Answer > A) It
supports SAFe Lean-Agile Principle #3 - Assume variability, preserve
options
Which two types of items are maintained in the Team Backlog? (Choose
two.)
A) Business Epics
B) Enabler Stories
C) User Stories
D) PI Objectives
E) Epic Enablers - Correct Answer > B) Enabler Stories
C) User Stories
Product Managers are expected to collaborate in planning the amount
of upcoming Enabler work by establishing what?
A) Team Backlog prioritization
B) Capacity allocation
C) Accurate user story sizing
D) Completed Epic acceptance criteria - Correct Answer > B) Capacity allocation
, The team is struggling to agree on the story point sizing of a new user
story. The PO was previously a related domain expert and feels the
team is wasting time. What should she do?
A) Instruct the SM to resize the story
B) Continue to support the team's decision on sizing
C) Make the team aware of her expertise and decide the size for them
D) Suggest the team stop the sizing of the user story and add it to the
next iteration as is - Correct Answer > B) Continue to support the team's
decision on sizing
True or False: Epics are estimated in story points rolled up from feature
estimates
A) True
B) False - Correct Answer > A) True
How frequently should the ART Backlog be reviewed?
A) Every week
B) When the Epic owners are defining the Epic Value Statement
C) Continuously
D) Before every PI - Correct Answer > C) Continuously
The first three elements of the Continuous Delivery Pipeline work
together to support delivery of small batches of new functionality.