100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CSLB CONCRETE C8 LICENSE FINAL EXAM, PRACTICE EXAM AND STUDY GUIDE NEWEST 2024 ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+BRAND NEW!!.pdf

Puntuación
-
Vendido
-
Páginas
70
Grado
A+
Subido en
27-04-2025
Escrito en
2024/2025

CSLB CONCRETE C8 LICENSE FINAL EXAM, PRACTICE EXAM AND STUDY GUIDE NEWEST 2024 ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+BRAND NEW!!.pdf

Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Grado

Información del documento

Subido en
27 de abril de 2025
Número de páginas
70
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CSLB Law & Business Set 1 n n n n n




Question 1: n


How must a client submit a claim for service or repair of a defect on fit and finish it
n n n n n n n n n n n n n n n n n n


ems after a remodel?
n n n


A.) by certified mail n n




B.) by overnight mail n n




C.) by personal delivery n n




D.) any of the above n n n


(Ans- D. A client may use the normal customer-
n n n n n n n n


service procedures agreed to between the client and the contractor, but the c
n n n n n n n n n n n n


lient must notify the contractor of the defect in writing by certified mail, overni
n n n n n n n n n n n n n


ght mail, or personal delivery before the client may file an action in court.
n n n n n n n n n n n n n




Question 2: n


What is the maximum allowed travel distance from any point of a work area to
n n n n n n n n n n n n n n


a fire extinguisher?
n n n




a.) 25nfeet

b.) 50nfeet

c.) 75nfeet

d.) 150nfeet
n (Ans- 75 feet n n




When should you renew contractors bond? (Ans-
n n n n n n


30 days before bond expires
n n n n n




Question 4: n

,If, during excavation, you unearth human remains or burial artifacts at a construc
n n n n n n n n n n n n


tion site, what should you do?
n n n n n




Click here to select answer B. Notif
n n n n n n


y the owner of the property.
n n n n n




Click here to select answer B.
n n n n n n


Stop work and place a warning ribbon three feet from the remains around the
n n n n n n n n n n n n n n


perimeter of the site. n n n




Click here to select answer C. Sto
n n n n n n n


p work immediately at that site.
n n n n n




nClick here to select answer D.
n n n n n


Stop work immediately at that site and any other nearby area that may hav
n n n n n n n n n n n n n


e remains.
n


(Ans-
nStop work immediately at that site and any other nearby area that may have r
n n n n n n n n n n n n n n


emains.

Question 5: n


Direct costs are $37,000, overhead is 12%, and profit is 5%. What is the sellin
n n n n n n n n n n n n n n


g price?
n


Click here to select answer A.
n n n n n n


$39,272.47

Click here to select answer B.
n n n n n n


$41,373.45

Click here to select answer C.
n n n n n n


$43,383.37

nClick here to select answer D.
n n n n n


$44,578.31
(Ans-
nD. The following solution is based on one of the references listed in the CSL
n n n n n n n n n n n n n n


B Study Guide. The solution may seem unorthodox, but you must
n n n n n n n n n n

,follow each step to arrive at the State's answer. Sum of overhead and profit p
n n n n n n n n n n n n n n


ercentages = 12% + 5% = 17% Percent of selling price that is direct costs
n n n n n n n n n n n n n n


= 100% - 17% = 83% = .83 Selling price = $37,000 ÷ .83 = $44,578.31 To
n n n n n n n n n n n n n n n n


check these calculations, add the subtotals: Direct costs = $44,578.31 ×
n n n n n n n n n n


.83 = $37,000.00 Overhead = $44,578.31 × .12 = $5,349.40 Profit =
n n n n n n n n n n n


$44,578.31 × .05 = $2,228.92 $37,000.00 + $5,349.40 + $2,228.92 =
n n n n n n n n n n


$44,578.32

Who pays FUTA? n n


a. employer
b. employee
c. 50% employer and 50% employee n n n n


d. 90% employer and 10% employee n n n n n


(Ans- A.) Employer n n




When you get an approved set of plans, what should you do first?
n n n n n n n n n n n n


(Ans- Read any notes from the building department.
n n n n n n n n




Of the following, which is best for determining the number of hours required fo
n n n n n n n n n n n n n


r different phases of a project and for making sure the job is on schedule? (An
n n n n n n n n n n n n n n n


s- critical path method
n n n




Which of the following provisions may not be included in a home improvemen
n n n n n n n n n n n n


t contract?
n




Click here to select answer A.
n n n n n n


Owner must pay for materials after they are delivered.
n n n n n n n n




Click here to select answer B.
n n n n n n


Owner must pay for materials before they are delivered.
n n n n n n n n




Click here to select answer C.
n n n n n n


The contractor may require a downpayment.
n n n n n

, nClick here to select answer D. Owner
n n n n n n n


may make progress payments.
n n n


(Ans- Owner must pay for materials before they are delivered.
n n n n n n n n n




B. The CONTRACTORS LICENSE LAW states: It is against the law for a c
n n n n n n n n n n n n n


ontractor to collect payment for work not yet completed, or for materials not
n n n n n n n n n n n n


yet delivered. However, a contractor may require a downpayment.
n n n n n n n n n




How many times may you take the contractor's license exam before your original
n n n n n n n n n n n n


napplication is voided? n n


(Ans- as many times as necessary within 18 months
n n n n n n n n




If it is discovered that the construction materials in an area contain more than
n n n n n n n n n n n n n n


0.1% asbestos: n


Click here to select answer A
n n n n n


the crew should try not to disturb the area but keep working.
n n n n n n n n n n n


nClick here to select answer B
n n n n n


the contractor should contact DOSH immediately.
n n n n n


Click here to select answer C
n n n n n


the workers should stop and remove the materials wearing masks and gloves
n n n n n n n n n n n


.
Click here to select answer D
n n n n n


the crew should wet down the area with water and continue working. (
n n n n n n n n n n n n


Ans- the contractor should contact DOSH immediately.
n n n n n n




B. Any manufactured material containing more than one-
n n n n n n n


tenth of one percent (0.1%) asbestos by weight meets the definition of "asbes
n n n n n n n n n n n n


tos-
ncontaining material"." Even if the surface area of these materials is less than
n n n n n n n n n n n n n


100 square feet, the contractor must file a report with the Occupational Carcin
n n n n n n n n n n n n


ogen Control Unit of DOSH.
n n n n




Which of the following are the most effective when used together on a private
n n n n n n n n n n n n n n


works project? n


Click here to select answer A
n n n n n


stop payment notice and mechanics lien
n n n n n
$20.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
PROFfESORMcCullough Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
7
Miembro desde
7 meses
Número de seguidores
0
Documentos
502
Última venta
1 mes hace

4.8

367 reseñas

5
329
4
23
3
7
2
7
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes