VIRGINIA HOME IMPROVEMENT CONTRACTING (HIC)
EXAM 2 VERSIONS (VERSION A AND B) COMPLETE
ACCURATE EXAM QUESTIONS WITH DETAILED VERIFIED
ANSWERS (100% CORRECT ANSWERS) /ALREADY
GRADED A+
2
landscaping
3 4
site
-… 1/1
3
, 4/4/25, 11:50 AM VIRGINIA HOME IMPROVEMENT CONTRACTING (HIC) EXAM 2 VERSIONS (VERSION A AND B) COMPLETE ACCURATE EXA…
Terms in this set (124)
The MOST specific Floor plan
information about the size
and location of windows
would be found in a
What direction does heat Hot to cold
flow?
What are batter boards stakes and ledger boards marking building lines
What is the MAXIMUM 3 feet
distance between a
ventilating opening in an
under-floor space and each
corner of the building?
What is NOT required in Load-bearing headers
exterior nonbearing walls?
A lengthwise grain Shake (c 326)
separation between or
through the growth rings
of lumber is
called a
The abbreviation "d" in "16d" Penny
means
Notches may not be located Middle 1/3
in the
_ ___ of a joist span
How should board and batten 1 inch overlap 10d nails
be installed?
What is the maximum 1/6 the depth of the member
allowable notch in ceiling
joists
How MUST rafters be framed Gusset plate (R802.3)
to each other
What is used to prevent Squash blocks
buckling at points of high
stress?
Prior to the installation of 4-5 days
wood floor how long for
acclimation?
-… 2/1
3