100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025 ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED ANSWERS (VERIFIED ANSWERS)A GRADE

Puntuación
5.0
(1)
Vendido
-
Páginas
35
Grado
A+
Subido en
26-12-2024
Escrito en
2024/2025

ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025 ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED ANSWERS (VERIFIED ANSWERS)A GRADE

Institución
ICC CALIFORNIA UST SERVICE
Grado
ICC CALIFORNIA UST SERVICE











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ICC CALIFORNIA UST SERVICE
Grado
ICC CALIFORNIA UST SERVICE

Información del documento

Subido en
26 de diciembre de 2024
Número de páginas
35
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025
ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED
ANSWERS (VERIFIED ANSWERS)A GRADE
1. UDC was required at time of installation for all sys- January 1, 2000
tems installed after?

2. July 1, 2005, service techs shall possess or work ICC UST Service
under someone who has a current certification indi- Technician Exam
cating he or she has passed the?

3. ICC cert must be renewed every? 24 months

4. Service techs must possess or be employed by a The individual has
person who has the appropriate contractor's license a tank testing li-
unless? cense

5. Service tech is defined by any individual who? Tests UST moni-
toring equipment,
trouble shoots
UST systems,
and/or installs
UST monitoring
equipment.

6. If the manufacturer training no longer exist, the local Approve compara-
agency may? ble alternate train-
ing .

7. UST includes? Tank and connect-
ed piping

8. What is considered a UST? A petroleum stor-
age tank.

9. What UST system meets the requirements for sec-
ondary containment? 11. Considered
"pipe" on
10. According to title 23; the following piping compo- tanks
nents if installed after July 1, 1987 must have sec- installed
ondary containment. after July 1,
2003.


,ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025
ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED
ANSWERS (VERIFIED ANSWERS)A GRADE
Doubled wall tanks

Pressured product piping


Pressured product piping and below






,ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025
ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED
ANSWERS (VERIFIED ANSWERS)A GRADE
ground vapor re-
covery.

12. Under dispenser containment (UDC) was required for December 31,
all existing UST systems by 2003

13. System for exchanging gas vapors in a storage tank Stage 1 vapor re-
and product in a fuel delivery truck covery

14. An approved method for non-visual monitoring for Statistical Invento-
existing UST systems. ry Reconciliation
(SIR)

15. ATG must be capable for detecting a release of? 0.2 gallons per
hour

16. What is no longer an approved method for non-visual Manual inventory
monitoring on existing UST systems? reconciliation.

17. Automatic line leak detectors installed on under- 3 gallons per hour
ground piping with secondary containment shall be at 10 psi
capable of detecting a leak of ?

18. How often should ATG be programmed to test the At least monthly
tank?

19. According to PEI RP 300, a combustible gas can be Detect vapor leaks
used to? in a vapor recov-
ery system.

20. According to PEI RP 300, a written scope of work for Construction
vapor recovery installation should include? plans

21. Positive shut off overfill protection device must stop 95% full
the flow of fuel when the tank is no more then?

22. According to Executive Order (EO) VR 201-A , what Depended filter
could cause a nozzle shut off mechanism or malfunc- seal damage
tion?


, ICC CALIFORNIA UST SERVICE TECHNICIAN EXAM NEWEST 2025
ACTUAL EXAM 300 QUESTIONS AND CORECT DETAILED
ANSWERS (VERIFIED ANSWERS)A GRADE
23. According to VR 201-A, breakaway reconnection Logged in GDF
must be? log

24. According to PEI RP 300 what is an INCORRECT Sketching a dia-
method of documenting piping location? gram on the inside
cover of vapor re-
covery equipment
manual

25. According to PEI RP 300 as built drawing or pictures maintained as
of the underground pipping and other components long as UST is in
shall be . service.

26. According to EO VR 101-E maintenance records are Name and Desig-
required to include what? nated UST Opera-
tor.

27. The Phil-Tite EVR Phase 1 system require that vapor Used with no more
vent pipes at any UST system be than 3 p/v valves

28. According to EO VR 2010 after installing a new spout Nozzle dispensing
assembly in the Healy 900 nozzle the following test shut off test
must be conducted?

29. According to Healy EO VR 201-A a vapor recovery Gasoline dispens-
record is to be maintained by? ing facility opera-
tor(GDF)

30. An enhanced leak detection test is required within 1000 feet
how many feet of a public drinking well?

31. What are the components of the Fire Triangle? Fuel, Heat/Ignition
Source, Oxygen

32. If equipped with an over fill alarm, it must be located? So it can be seen
or heard from the
delivery location.
$24.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Reseñas de compradores verificados

Se muestran los comentarios
1 año hace

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
mingyong Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
47
Miembro desde
1 año
Número de seguidores
0
Documentos
415
Última venta
2 días hace
proflean

I specialize in providing high-quality documents containing expertly crafted questions and answers tailored to a variety of subjects and disciplines. Whether you\\\'re preparing for exams, completing assignments, or simply expanding your knowledge, my materials are designed to meet your academic and professional needs. Why Choose My Materials? Accurate Content: All answers are thoroughly researched and verified for correctness. User-Friendly Format: Organized for easy navigation and understanding. Wide Coverage: Suitable for students, professionals, and researchers across diverse fields. Affordable Pricing: High-quality materials at pocket-friendly rates. Timely Updates: Regularly updated to ensure relevance and alignment with current syllabi. My Commitment to You I am dedicated to supporting your academic success by delivering resources that simplify learning and make studying more efficient.

Lee mas Leer menos
4.4

309 reseñas

5
161
4
114
3
29
2
3
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes