1. After clicking to location the first step when the use of the Staircase tool, what does the
red measurement indicate? - ANS-The general upward thrust of the staircase
2. After the usage of the Square Break device why have to you click on on the wall and test
the measurements? - ANS-After setting a ruin, you'll see the measurements shift, relying
on the wall thickness
3. Before dragging a wall handle, protecting down the which key on your keyboard will
create a brand new room? - ANS-CNTRL - manage
4. Changing Project Profiles from Carrier vs Contractor - ANS-1 Save and Exit the mission
5. 2 From the local page, click at the estimate
6. 3 From the pull-out menu, click on duplicate
7. 4 Verify the undertaking has a unique name
8. 5 Select the precise Profile from the menu
9. 6 Click OK, the duplicated venture is now to be had
10. Claim Info - ANS-contact records and vicinity of the loss or repair - can also enter
information regarding the consumer's policy
11. Coverage A: Dwelling - ANS-Covers harm to the residence. The quantity of the coverage
is the maximum you'll acquire if your house is completely destroyed.
12. Coverage B: Other Structures - ANS-Covers harm to different systems or buildings on
the assets, such as a indifferent garage, paintings shed or fence
13. Coverage C: Personal Property - ANS-Covers harm to or loss of personal assets.
Personal property includes household contents and other non-public property used,
owned or worn by way of you or own family.
14. Coverage D: Additional Living Expense - ANS-Covers extra dwelling costs when
incurred, this means that that the policy covers the vital dwelling prices as much as the
stated restriction incurred via the insured to preserve. (ALE)
15. Creating a brand new estimate steps - ANS-Click new undertaking, ensure Estimate is
selected in the pinnacle field, spotlight the project call and kind the name of the task or
hold "date primarily based" challenge call, choose correct profile and select, click create.
Select a rate listing and click subsequent. Select tax jurisdiction for estimate and click
Done.
16. Creating a New Estimate: - ANS-1. From Xactimate Dashboard Local Page, click on
NEW PROJECT
17. 2. Make positive Estimate is selected inside the pinnacle area
18. three. Highlight the challenge name (based on today's date) and sort the name of the
venture or you could change to call specific
19. four. Make positive the right profile is chosen in the profile area
20. five. Click create
21. 6 Select a charge listing you need to apply
22. Detach & Reset - ANS-R
, 23. Four alternatives available for staircase wall types: - ANS-Full
24. Missing (give up to give up)
25. Missing above stairs
26. Partially missing above stairs
27. From any Quick Entry field, press ____on your keyboard to transport your cursor to the
following line to begin including new line objects. - ANS-Enter
28. How do you upload a new task? - ANS-1 Add a new venture from nearby web page,
click New Project button. New challenge window seems.
29. 2 Change default name to (example) XW-Lopez- observed by means of your initials
30. three Click "create" to add the brand new venture - the challenge will seem to your
dashboard
31. How do you create an overbuild? - ANS-First use the SQUARE BREAK TOOL after
which maintain down the CTRL key previous to clicking and dragging the roof cope with
out.
32. How regularly are Xactimate price lists commonly updated? - ANS-Monthly
33. If an overbuild roof isn't always a _________ of the primary roof then those portions will
no longer be calculated with the main roof? - ANS-subgroup
34. If the activity of an Item is modified, the unit charge for the item does not change. True or
False - ANS-False
35. If you want to make the adjustments to an estimate that has a status of Completed, you
need to do what?? - ANS-Change the estimate repute to In Progress
36. In some cases, you can leave inspection end result objects if they may be correct for the
scope of the estimate. True or False - ANS-True
37. Install Only - ANS-I
38. It is often a properly concept to click on the ____ button to make certain the rendering of
the roof resembles the actual roof. - ANS-3D
39. Items with default calculations must never be modified. True or False - ANS-False
40. Lock the scale of the opposing roof face - ANS-When adding an extension to the eave of
a roof, how do you keep the ridge from transferring?
41. Making an estimate Completed is necessary to add it back to XactAnalysis. True or
False - ANS-False
42. Material Only - ANS-M
43. Name the four sections that incorporate the Sketch window... - ANS-Tools
44. Search
45. Sketch workspace
46. Items
47. Non-recoverable depreciation - ANS-the amount of depreciation this is permanently
deducted from the amount the insured gets for the loss
48. Once a roof has been positioned, the roof type may be modified where? -
ANS-Properties window
49. Once an object is at the cursor, which click on let you choose additional objects relating
to the original item? - ANS-Right Click
50. Once you create a Modl Statement (commencing or closing), it is handiest to be had for
that estimate you created it in. True or False - ANS-False