100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

ACI WRITTEN TEST EXAM 2024 ACTUAL EXAM 2 VERSIONS (VERSION A AND B) COMPLETE 400 QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT ANSWERS) / ALREADY GRADED A+

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
08-12-2024
Escrito en
2024/2025

ACI WRITTEN TEST EXAM 2024 ACTUAL EXAM 2 VERSIONS (VERSION A AND B) COMPLETE 400 QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT ANSWERS) / ALREADY GRADED A+ The total time allowed between obtaining the first and final portions of a composite sample is - ANSWER -15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - ANSWER -F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - ANSWER -5 minutes Begin molding test specimens within ______ minutes after obtaining the composite sample - ANSWER -15 minutes The concrete samples should be protected from - ANSWER -the sun, wind, and other sources of rapid evaporation, from contamination When test specimens are to be molded, the minimum size of sample obtained is - ANSWER -28 L (1 ft^3) The primary objective of the sampling process is to obtain a representative sample (T or F) - ANSWER -T When sampling from a revolving drum truck mixer collect concrete from ______ portions of the batch - ANSWER -2 or more Wet sieving is performed - ANSWER -when the concrete contains aggregates larger than appropriate for a test 2 | P a g e Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved. When sampling from a paving mixer it is not acceptable to place 3 small containers on the sub grade in order to obtain the required samples of concrete (T or F) - ANSWER -F TEMPERATURE - ANSWER - it may require up to ___ min before the temp stabilizes when the NMS of the coarse agg is greater than ___ - ANSWER -20min., 3in. The container for the concrete shall be large enough to provide at least ___ inches, or _____ of coarse agg, of concrete in all directions around the TMD - ANSWER -3in., 3 x NMS The temperature measuring device shall have the capability of measuring the temperature of the freshly mixed concrete to ± ______ oF accuracy and have a range of ______ to ______ oF. - ANSWER -1,30to120 A composite sample of concrete is not required even if the only purpose for obtaining the sample is to determine temperature. T or F - ANSWER -T The Temperature Measuring Device used for determining concrete temperature must be calibrated ______ or whenever there is a question of accuracy. - ANSWER -annually The temperature of freshly mixed concrete can be measured in - ANSWER -all of the above Submerge the sensing portion of the thermometer at least ______ inches into the concrete - ANSWER - 3 Gently press concrete around the thermometer such that the_______ does not affect the reading. - ANSWER -ambient air temp 3 | P a g e Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved. The thermometer must remain in the concrete during the measurement for a minimum of ______ minutes. In addition, the temperature measurement must be completed within _______ minutes after obtaining the sample. - ANSWER -2, 5 The temperature of freshly mixed concrete is measured and recorded to the nearest _____ - ANSWER -1 degree SLUMP TEST - ANSWER - ****The slump test does not provide an indication of the water content of a concrete mixture. - ANSWER -F A slump mold can be fabricated from both plastic and metal. - ANSWER -T ****The length of the tamping for the slump test shall be approximately - ANSWER - The slump test is applicable to concrete having a coarse aggregate up to _______ inch in size. - ANSWER -1.5 inches The height of the slump cone is - ANSWER -12 in 6. The exterior of the slump cone is tapped 10 to 15 times after rodding each layer. - ANSWER -F The slump mold is filled with three layers of concrete - ANSWER -by volume 8. If the top surface of the concrete falls below the top of the slump cone while rodding the final layer of concrete, - ANSWER -stop, add concrete to maintain an excess, then continue the rod c

Mostrar más Leer menos
Institución
ACI WRITTEN
Grado
ACI WRITTEN









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ACI WRITTEN
Grado
ACI WRITTEN

Información del documento

Subido en
8 de diciembre de 2024
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

1|Page



ACI WRITTEN TEST EXAM 2024 ACTUAL EXAM 2 VERSIONS (VERSION A AND
B) COMPLETE 400 QUESTIONS WITH DETAILED VERIFIED ANSWERS (100%
CORRECT ANSWERS) / ALREADY GRADED A+



The total time allowed between obtaining the first and final portions of a composite sample is - ANSWER

✔✔-15 minutes


When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the

individual samples are remixed into a composite sample (T or F) - ANSWER ✔✔-F


Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the

composite sample - ANSWER ✔✔-5 minutes


Begin molding test specimens within ______ minutes after obtaining the composite sample - ANSWER

✔✔-15 minutes


The concrete samples should be protected from - ANSWER ✔✔-the sun, wind, and other sources of rapid

evaporation, from contamination


When test specimens are to be molded, the minimum size of sample obtained is - ANSWER ✔✔-28 L (1

ft^3)


The primary objective of the sampling process is to obtain a representative sample (T or F) - ANSWER

✔✔-T


When sampling from a revolving drum truck mixer collect concrete from ______ portions of the batch -

ANSWER ✔✔-2 or more


Wet sieving is performed - ANSWER ✔✔-when the concrete contains aggregates larger than appropriate

for a test




Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved.

, 2|Page


When sampling from a paving mixer it is not acceptable to place 3 small containers on the sub grade in

order to obtain the required samples of concrete (T or F) - ANSWER ✔✔-F


TEMPERATURE - ANSWER ✔✔-


it may require up to ___ min before the temp stabilizes when the NMS of the coarse agg is greater than

___ - ANSWER ✔✔-20min., 3in.


The container for the concrete shall be large enough to provide at least ___ inches, or _____ of coarse agg,

of concrete in all directions around the TMD - ANSWER ✔✔-3in., 3 x NMS


The temperature measuring device shall have the capability of measuring the temperature of the freshly

mixed concrete to ± ______ oF accuracy and have a


range of ______ to ______ oF. - ANSWER ✔✔-1,30to120


A composite sample of concrete is not required even if the only purpose for obtaining the sample is to

determine temperature. T or F - ANSWER ✔✔-T


The Temperature Measuring Device used for determining concrete temperature must be calibrated

______ or whenever there is a question of accuracy. - ANSWER ✔✔-annually


The temperature of freshly mixed concrete can be measured in - ANSWER ✔✔-all of the above


Submerge the sensing portion of the thermometer at least ______ inches into the concrete - ANSWER ✔✔-

3


Gently press concrete around the thermometer such that the_______ does not


affect the reading. - ANSWER ✔✔-ambient air temp




Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved.
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
OliviaGreenways Howard Community College
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
34
Miembro desde
1 año
Número de seguidores
2
Documentos
1835
Última venta
3 días hace
StudenT SaveR TeaM.

On this page, you find all documents, package deals, and flashcards offered by seller OliviaGreenways.

4.6

5 reseñas

5
4
4
0
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes