According to Ansi/BPI 1200 standard, which of the following unvented heating would need to be
removed from service? - the 15,000 btu/hr. from the bedroom (review the standard)
A natural draft furnace is back drafting regardless of the caz door position. and air handler operation. -
(According to ansi/bpi1200 standard. have a qualified professional evalute it. BPI standed p.41)
Review picture of air conditioner, what is the nominal rating for this unit? And if the work order called 3
ton and was the installed is this an issues - Rember 12,00 btu = 1 ton, 2 ton system , look at model
number, incremented of 12 "24" in model number 24,000btu/hr. or 2 tons of coolings. yes, it would be
undersized.
a customer recieves thier utility bills for the year. what is the annual heating load in terms for the
heationg season from oct1st - mau 31st? - look at graph and calculate the months
savings to investment picture - look at picture graph an identify which window is label incorrect (window
replacement SIR 4.5)
Energy Model software - A computer model created to test or verify the thermal/energy performance of
the building, particularly the facade and mechanical systems ....Calculates return on investments
what would happen if the orientation was inputted wrong into the energy modeling software. - the
orientation of the software would affect the ROI
if the walls were input 20% less than actual wall? - the calculation on ROI for cellulose wall insulation
would be affected.
what set points would not be monitored for energy consumption. - Humidity control settings.
how to calibrate the energy model software? - input 1 year of energy bills.
, Air conditioning installation should match the projected load of the home or dwelling. - do not install
what you have taken out.
RMS - is a book used to eistamate labor and materials
spay foam (polyurethane) - an ignition barrier is a material used with foam insulation to prevent the
foam from igniting.
Ventilation - calculate using formula.
ventilation purpose - is to dilute indoor air pollutants
the occupied floor area is used for calculating? - the ventilation requirements
if the buildings air flow is below the minimum air ventilation requirements - mechanical ventilation must
be supplied.
if knob-and-tube wiring is present in the attic? - list in the work order as a potential hazard
decommission knob and tube when? - prior to installing insulation
depending on the situation, the elctrican may choose one of these two options for knob and tube, -
decommission and replace with non-metallic (nm) sheathed electrical cable.
Combustion Air Picture, do these combustion appliances need additinal combustion air? - yes, the
appliance required a volume of 4000 cubic feet.
how to calculate combustion air. - Step 1. calculate room volume (l 10x w12 x h8=960)
Step 2. total appliance ratings btu's / by 1000. (8000/1000=80) Step 3. room volume960/ 80 = 12 cuft
*** look at step 3 and if the number is less than 50 cuft air is needed!!!
Answers (100 %Score) Latest Updated 2024/2025 Comprehensive Questions A+ Graded
Answers | With Expert Solutions
According to Ansi/BPI 1200 standard, which of the following unvented heating would need to be
removed from service? - the 15,000 btu/hr. from the bedroom (review the standard)
A natural draft furnace is back drafting regardless of the caz door position. and air handler operation. -
(According to ansi/bpi1200 standard. have a qualified professional evalute it. BPI standed p.41)
Review picture of air conditioner, what is the nominal rating for this unit? And if the work order called 3
ton and was the installed is this an issues - Rember 12,00 btu = 1 ton, 2 ton system , look at model
number, incremented of 12 "24" in model number 24,000btu/hr. or 2 tons of coolings. yes, it would be
undersized.
a customer recieves thier utility bills for the year. what is the annual heating load in terms for the
heationg season from oct1st - mau 31st? - look at graph and calculate the months
savings to investment picture - look at picture graph an identify which window is label incorrect (window
replacement SIR 4.5)
Energy Model software - A computer model created to test or verify the thermal/energy performance of
the building, particularly the facade and mechanical systems ....Calculates return on investments
what would happen if the orientation was inputted wrong into the energy modeling software. - the
orientation of the software would affect the ROI
if the walls were input 20% less than actual wall? - the calculation on ROI for cellulose wall insulation
would be affected.
what set points would not be monitored for energy consumption. - Humidity control settings.
how to calibrate the energy model software? - input 1 year of energy bills.
, Air conditioning installation should match the projected load of the home or dwelling. - do not install
what you have taken out.
RMS - is a book used to eistamate labor and materials
spay foam (polyurethane) - an ignition barrier is a material used with foam insulation to prevent the
foam from igniting.
Ventilation - calculate using formula.
ventilation purpose - is to dilute indoor air pollutants
the occupied floor area is used for calculating? - the ventilation requirements
if the buildings air flow is below the minimum air ventilation requirements - mechanical ventilation must
be supplied.
if knob-and-tube wiring is present in the attic? - list in the work order as a potential hazard
decommission knob and tube when? - prior to installing insulation
depending on the situation, the elctrican may choose one of these two options for knob and tube, -
decommission and replace with non-metallic (nm) sheathed electrical cable.
Combustion Air Picture, do these combustion appliances need additinal combustion air? - yes, the
appliance required a volume of 4000 cubic feet.
how to calculate combustion air. - Step 1. calculate room volume (l 10x w12 x h8=960)
Step 2. total appliance ratings btu's / by 1000. (8000/1000=80) Step 3. room volume960/ 80 = 12 cuft
*** look at step 3 and if the number is less than 50 cuft air is needed!!!