100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

WGU C723 Quantitative Analysis for Business Exam (NEW 2023/ 2024) 100% Correct| Questions and Verified Answers| Graded A

Puntuación
-
Vendido
-
Páginas
47
Grado
A+
Subido en
29-11-2023
Escrito en
2023/2024

WGU C723 Quantitative Analysis for Business Exam (NEW 2023/ 2024) 100% Correct| Questions and Verified Answers| Graded A QUESTION Why are the managers not ready to prepare a mathematical model to solve the problem? Answer: The problem has not been determined. QUESTION Why should the managers first consider a qualitative approach to the company situation? Answer: The problem is complex. QUESTION [True/False] An automotive design company is creating a new style of seat for the latest line of automobiles. They are drawing up average weight, height, and body size of potential drivers. This is a business problem demanding quantitative specifics. Answer: True QUESTION [True/False] A meteorologist analyzes numerical differences in weather patterns using quantitative analysis to determine the likelihood of an impending tornado. This is an appropriate use of quantitative analysis. Answer: True QUESTION Is the variable in the following scenario a dependent or independent variable? The use of heating oil goes up as the temperature goes down. What type of variable is the temperature? Answer: Independent QUESTION [True/False] An inventory manager uses a model to calculate the proper amount of inventory to order. This is an example of quantitative analysis. Answer: True QUESTION [True/False] The following problem can be solved using expected monetary value (EMV) analysis: A farmer is calculating the correct mixture of nutrients to go into the annual spraying of a crop. Answer: False QUESTION In performing inventory analysis, the costs associated with holding on-hand inventory is called _______. Answer: Carrying costs QUESTION Project scheduling is the process of scheduling the individual tasks required to meet the project deliverables. These tasks are scheduled in a rational sequence to meet the time objectives of the project. In preparing the schedule, the duration for each of the tasks and its sub-tasks is estimated, thus providing a total estimated duration for each task. The sum of the duration of all the tasks is the estimated duration for the whole project. One common technique for estimating the duration of tasks is the beta distribution method. This method uses three duration estimates for the task, pessimistic, optimistic, and most likely, in order to consider variation in the final duration estimate. This method is thought to give a better final estimate for a task's duration. The beta distribution method is equal to the sum of the optimistic time estimate for the task (o), four times the most likely time (m) estimate, and the pessimistic time estimate (p), this result is then divided by six. The formula is: Te = (o + 4m + p) / 6 Calculate duration estimates for the following situations: A construction manager received an estimate from a sub-contracted plumber for completion of the 2.5 bathrooms. The plumber thought it could be done in as few as 20 labor hours, although this type of design usually takes 28 hours. The plumber does remember that the last time, it took

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
29 de noviembre de 2023
Número de páginas
47
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$10.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ace_it Walden University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
3736
Miembro desde
5 año
Número de seguidores
1918
Documentos
4710
Última venta
5 horas hace

3.9

595 reseñas

5
294
4
117
3
98
2
31
1
55

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes