What criteria does vegetation need in order to be considered
established? -
ANSWER-the ground cover
must be:
1)
uniform
2) mature enough to
survive
3) able to inhibit
erosion
What legal agreement allows VSMP inspectors to access
property for conducting post-construction BMP inspections? -
ANSWER-A long-term maintenance agreement
Who must sign and seal a construction record drawing, and
when must it be submitted to the VSMP authority? - ANSWER-
must be signed by a professional registered in VA. Must be
submitted before permit termination.
How much time does the VSMP authority have to terminate any
bonds or securities provided by the operator? - ANSWER-
Within 60 days of completing the requirements of the permit
conditions
, How often must a VSMP authority inspect a SWM facility post-
construction? -
ANSWER-Every 5 years, OR the owner may submit reports
completed be a
qualified person on an
annual basis
What is the TP limit for a site? - ANSWER-0.41 lbs/ac/yr
The phosphorus load limit uses what % impervious cover? -
ANSWER-10%
Part II B and II C water quantity criteria addresses: -
ANSWER-channel
protection and flood
protection
Of all the plans included in the SWPPP, which two must
be approved? -
ANSWER-the SWM and ESC
Plans
Does a SWM plan address runoff during or after construction? -
ANSWER-post-
construction