ACQ 202 Module 1 Exam:
Consideration of Alternatives 2026
Questions and Answers (100% Correct
Answers) Already Graded A+
What element of International Acquisition & Exportability
(IA&E) assesses the risks of transferring controlled technology
and information that provide U.S. warfighters a combat
© 2026 Assignment
advantage as well as the benefits of international
participation? Ans: -IA&E Planning & Analysis incorrect
Guru01 - Stuvia
-International Contracting
Expert
-International Cooperative Programs incorrect
-Technology Security and Foreign Disclosure incorrect
-Sales & Transfers
-Defense Exportability incorrect
What is the procurement cost of this system?
Cost Types Cost (in millions of dollars)
Research, Development, Test & Evaluation $400
Procurement of Prime Mission Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares $100
, 2
Operations and Support $70,0000
Disposal $100 Ans: -$1,400 million
-$800 million
-$900 million
-$1,000 million
© 2026 Assignment
The largest amount of cost for a system is related to its
operations and support. Ans: -True
Guru01 - Stuvia
Expert
-False
Which of the following are characteristics of International
Cooperation Programs (ICPs)? (Select the three that apply.)
Ans: -Shared cost
-Shared risks and benefits
-One way transfers/grants
-Foreign aid
-Buyer-seller relationship
-Government-to-Government
Program Management Offices/Integrated Product Teams
should conduct their initial International Acquisition &
Exportability (IA&E) Assessment during the Production &
Deployment phase of traditional, major capability 5000.02
acquisition programs. Ans: -True
, 3
-False
Program-level exportability feasibility studies should be
conducted as early as possible in a system's life cycle to assess
the international market for potential cooperative programs,
foreign sales, or transfers; identify the feasibility of designing
and developing defense exportability features (DEF) for the
system; and estimate potential return on investment from
future international acquisition partnership and sales efforts.
Ans: -True
© 2026 Assignment
-False
Guru01 - Stuvia
DoD receives a Foreign Military Sales (FMS) Letter of Request
Expert
(LOR) from an allied nation for a DoD system that is currently
in Low Rate Initial Production. At this point in the acquisition
life cycle, what are the possible impacts to the program if an
exportable version of the system is available for offer to this
prospective FMS customer? (Select the three that apply.) Ans:
(WRONG COMBINATION)
-Lower research and development costs through Research,
Development Test, and Evaluation (RDT&E) cost sharing
-Lower production costs for the DoD and the FMS customer
due to economic order quantity savings
-Reduced DoD and FMS customer Operations & Support (O&S)
costs if common product support strategies are used
-Enhanced U.S. political-military relationships with foreign
nations
(WRONG COMBINATION)