WGU C215 OPERATIONS MANAGEMENT OBJECTIVE ASSESSMENT 2024 LATEST EXAMS (2 VERSIONS A & B) WITH 140 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS GRADED A+ / WGU C215 OA LATEST EXAM 2024 Exam

Puntuación
-
Vendido
-
Páginas
194
Grado
A+
Subido en
18-01-2026
Escrito en
2025/2026

WGU C215 OPERATIONS MANAGEMENT OBJECTIVE ASSESSMENT 2024 LATEST EXAMS (2 VERSIONS A & B) WITH 140 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS GRADED A+ / WGU C215 OA LATEST EXAM 2024 Exam

Institución
3x@m
Grado
3x@m











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
3x@m
Grado
3x@m

Información del documento

Subido en
18 de enero de 2026
Número de páginas
194
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

WGU C215 OPERATIONS MANAGEMENT OBJECTIVE
ASSESSMENT 2024 LATEST EXAMS (2 VERSIONS A & B)
WITH 140 ACTUAL EXAM QUESTIONS AND CORRECT
ANSWERS GRADED A+ / WGU C215 OA LATEST EXAM 2024

Exam




Total Quality Management (TQM) Philosophy -
<<<<Answers>>>>1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality

Process Capability Index (Cpk) - <<<<Answers>>>>Basic
function of Six Sigma. Measures the process potential and
performance of processes. The higher the range of Cpk,
the improved is the ability of the process to complete its
necessities. Uses both the process variability and the
process specifications to determine whether the process is
"capable."

Six Sigma - <<<<Answers>>>>A disciplined, data-driven
approach and methodology for eliminating defects (driving
toward six standard deviations between the mean and the
nearest specification limit) in any process - from

,manufacturing to transactional and from product to
service.

Design Capacity - <<<<Answers>>>>The theoretical
maximum output of a system in a given period under ideal
conditions.

Effective Capacity - <<<<Answers>>>>The capacity a firm
expects to achieve given its current operating constraints.

Location Analysis - <<<<Answers>>>>proximity to
customers, transportation, source of labor, community
attitude, proximity to suppliers, and many other factors.

Line Processes - <<<<Answers>>>>A type of process
used to produce a large volume of a standardized product.

Batch Processes - <<<<Answers>>>>A type of process
used to produce a small quantity of products in groups or
batches based on customer orders or specifications.

Project Processes - <<<<Answers>>>>A type of process
used to make a one-at-a-time product exactly to customer
specifications.

Continuous Processes - <<<<Answers>>>>A type of
process that operates continually to produce a high
volume of a fully standardized product.

Bottleneck - <<<<Answers>>>>Longest task in the
process.

,Flexible Manufacturing System (FMS) -
<<<<Answers>>>>A type of automated system that
combines the flexibility of intermittent operations with the
efficiency of continuous operations.

Output/Input Control - <<<<Answers>>>>A technique for
monitoring the flow of jobs between work centers.

Value-Added - <<<<Answers>>>>The net increase
created during the transformation of inputs into final
outputs.

Hybrid Layouts - <<<<Answers>>>>Layouts that combine
characteristics of process and product layouts.

Relationship Chart (REL) - <<<<Answers>>>>Table that
reflects opinions of managers with regard to the
importance of having any two departments close together.

Rectilinear Distance - <<<<Answers>>>>The shortest
distance between two locations using north-south and
east-west movements.

From-To Matrix - <<<<Answers>>>>Table that gives the
number of trips or units of product moved between any
pair of departments.

Block Plan - <<<<Answers>>>>Schematic showing the
placement of resources in a facility.

, Mean Observed Times - <<<<Answers>>>>The average
of the observation times for each of the work elements.

Normal Time - <<<<Answers>>>>The mean observed
time multiplied by the performance rating factor by the
frequency of occurrence.

Standard Time - <<<<Answers>>>>The length of time it
should take a qualified worker using appropriate process
and tools to complete a specific job, allowing time for
personal fatigue and unavoidable delays.

Just-in-Time (JIT) - <<<<Answers>>>>A philosophy
designed to achieve high-volume production through
elimination of waste and continuous improvement. Based
on a "pull" system rather than a "push" system. The three
elements are just-in-time manufacturing, total quality
management, and respect for people.

Kanban card - <<<<Answers>>>>A card that specifies the
exact quantity of product that needs to be produced.

Continuous Improvement - <<<<Answers>>>>A
philosophy of neverending improvement.

Tier One Suppliers - <<<<Answers>>>>Supplies materials
or services directly to the processing facility.

Tier Two Suppliers - <<<<Answers>>>>Directly supplies
materials or services to a tier one supplier in the supply
chain.
$26.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Bestdoctorwails Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
34
Miembro desde
1 año
Número de seguidores
3
Documentos
1472
Última venta
16 horas hace

Many students don't have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don't hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

4.9

269 reseñas

5
256
4
6
3
2
2
2
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes