Question 1: Which Florida agency regulates septic tank contractors?
A) Florida Department of Environmental Protection (DEP)
B) Florida Department of Health (DOH)
C) Florida Department of Business and Professional Regulation (DBPR)
D) Florida Water Management Districts
Answer: B
Explanation: The Florida Department of Health (DOH) regulates septic tank contractors
under Chapter 64E-6, Florida Administrative Code.
Question 2: What is the minimum age requirement for a Florida septic tank contractor
license?
A) 18 years
B) 21 years
C) 25 years
D) No minimum age
Answer: A
Explanation: Applicants must be at least 18 years old to obtain a Florida septic tank
contractor license.
Question 3: How many years of experience are required for a septic tank contractor license
in Florida?
,A) 1 year
B) 2 years
C) 3 years
D) 4 years
Answer: C
Explanation: Florida requires 3 years of practical experience in onsite sewage treatment
and disposal systems.
Question 4: What exam must be passed for Florida septic tank contractor licensure?
A) Business management exam only
B) Trade exam only
C) Both trade and business exams
D) No exam required with experience
Answer: B
Explanation: Florida requires passing the septic tank contractor trade examination.
Question 5: How often must Florida septic tank contractor licenses be renewed?
A) Annually
B) Every 2 years
C) Every 3 years
D) Every 5 years
Answer: B
Explanation: Septic tank contractor licenses must be renewed every 2 years.
,Question 6: How many continuing education hours are required for license renewal?
A) 6 hours
B) 12 hours
C) 16 hours
D) 24 hours
Answer: C
Explanation: Florida requires 16 hours of continuing education every 2 years for renewal.
Question 7: What is the minimum passing score for the Florida septic tank contractor
exam?
A) 60%
B) 70%
C) 75%
D) 80%
Answer: B
Explanation: The minimum passing score is 70% on the septic tank contractor
examination.
Question 8: What is the minimum setback distance from a septic tank to a private water
well in Florida?
A) 50 feet
B) 75 feet
C) 100 feet
D) 150 feet
, Answer: B
Explanation: Minimum 75 feet from septic tank to private water well.
Question 9: What is the minimum setback distance from a drainfield to a private water well
in Florida?
A) 100 feet
B) 150 feet
C) 200 feet
D) 250 feet
Answer: A
Explanation: Minimum 100 feet from drainfield to private water well.
Question 10: What is the minimum setback distance from a septic tank to a building
foundation in Florida?
A) 5 feet
B) 10 feet
C) 15 feet
D) 20 feet
Answer: A
Explanation: Minimum 5 feet from septic tank to building foundation.
Question 11: What is the minimum setback distance from a drainfield to a building
foundation in Florida?
A) 5 feet