100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

SAFe RTE 6.0 Exam Questions and Answers 100% Pass |Already Graded A+| Verified and Updated |Actual 2025/2026 Cheat Sheet

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
24-10-2025
Escrito en
2025/2026

SAFe RTE 6.0 Exam Questions and Answers 100% Pass |Already Graded A+| Verified and Updated |Actual 2025/2026 Cheat Sheet

Institución
SAFe Scrum Master
Grado
SAFe Scrum Master









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
SAFe Scrum Master
Grado
SAFe Scrum Master

Información del documento

Subido en
24 de octubre de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

SAFe RTE 6.0
Study online at https://quizlet.com/_hurgfm

1. What is one function of capacity allocation in SAFe?: To facilitate working agreements on
the capacity to apply between different types of work
2. To evolve the role of a leader in SAFe, which practices can the Release Train
Engineer (RTE) recommend?: Encourage personal development
3. At which stage will the ART act as a one-team culture?: Creating a flow of knowledge
across the teams and ART, known as performing
4. Which primary role should emphasize lifelong learning?: Lean-Agile Leaders
5. What is one tool used to identify bottlenecks?: Value Stream Mapping
6. Which role should the Release Train Engineer (RTE) play related to a
hackathon event?: Allow the teams as much flexibility as possible to promote innovation
7. What is one method for securing stakeholder commitment to the ART?: Have
them attend the PI Planning
8. What is one characteristic of the Release Train Engineer (RTE) role?: Creates an
environment of mutual influence
9. What is one action done immediately during the management review and
problem-solving meeting?: Change the scope
10. What is an outcome of the team's draft plan review at the end of the first day
of PI Planning?: Risks and impediments
11. What is one responsibility of the Release Train Engineer (RTE) during PI
execution?: To escalate and track impediments
12. What is one recommended practice that helps with the preparation and
facilitation of distributed planning events?: Request a technical support person be present at
each location
13. Which statement is true about using a ART Kanban system?: All work is visualized,
and progress is continually tracked (??)
14. During which part of an Inspect & Adapt (I&A) event are differences between
planned business value and actual business value presented?: Quantitative and quali-
tative measurement
15. When is the best time to conduct the pre-PI Planning activities?: Throughout the
previous PI
16. Which SAFe principle supports having a one-week iteration?: Apply cadence, syn-
chronize with cross-domain planning
1/5

, SAFe RTE 6.0
Study online at https://quizlet.com/_hurgfm

17. What practice can help identify bottlenecks in the flow of work?: Visualizing the flow
of all work and track the progress of individual items
18. Which core competency best describes the critical skills of Scrum, Kanban,
and the built-in quality practices needed to manage the flow of value?: Team and
Technical Agility
19. A Release Train Engineer (RTE) wants to try a new retrospective technique
at the next Inspect and Adapt (I&A) event. However, the RTE is unsure how to
prepare and thinks there may be some pitfalls. How can the RTE get help?: Share
and receive feedback from other RTEs in a community of practice
20. A Release Train Engineer (RTE) primarily establishes a relationship with which
role?: System Architect (and Product Management)
21. What is one benefit hackathons provide during the Innovation and Planning
(IP) iteration?: They help drive innovations that help the business
22. What is the only true objective measure of an ART?: System Demo
23. After an ART's first PI Planning, what action can the Release Train Engineer
(RTE) take to help optimize the ART Backlog readiness for the next PI?: Coach
Product Management and the System Architect to include ART Backlog refinement into their cadence-based approach
24. What is one benefit of maintaining limited work in process (WIP)?: The fast flow
of items through the system
25. During the storming stage of ART development and evolution, in which area
should a Release Train Engineer (RTE) mentor Scrum Masters/Team Coaches
(SM/TC)?: Conflict resolution techniques
26. What action can reduce team collaboration during the PI Planning event?: -
Overpreparing for PI Planning
27. What is one primary responsibility of a Release Train Engineer (RTE)?: Manage
and optimize the flow of value through the ART
28. What problem can occur without an Innovation and Planning (IP) iteration?-
: Technical debt grows uncontrollably
29. Which DevOps practice is encouraged when organizing an ART to optimize
the flow of work and increase the delivery of value?: Reduce work batch sizes


2/5
11,49 €
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EmilyCharlene Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
449
Miembro desde
2 año
Número de seguidores
138
Documentos
21614
Última venta
2 días hace
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3,7

98 reseñas

5
46
4
13
3
15
2
7
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes