100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Michigan Builders License Exam Questions With 100%Verified Answers A+GRADED

Puntuación
-
Vendido
-
Páginas
56
Grado
A+
Subido en
12-08-2024
Escrito en
2024/2025

Michigan Builders License Exam Questions With 100%Verified Answers A+GRADED Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - correct answer...IRC (International Residential Code) Administrative - correct answer...First 2 chapters of code book are True - correct answer...Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F Yes - correct answer...Does the building official have the authority to render interpretations of the code? 8 foot fence. - correct answer...None of the following require a permit, EXCEPT: sidewalks and driveways tiling an 8 foot fence playground equipment False - correct answer...Tables and illustrations are always supported by information found in the written code and footnotes. T or F Live load. - correct answer...The amount of evenly distributed weight imposed by inhabitants, goods and removable objects on a floor or roof system is referred to as True. - correct answer...If a code requirement is in the book, it is both acceptable and enforceable by the code official. T or F Figures. - correct answer...Illustrations are typically referred to as Determine that buildings are built to the minimum enforceable standard. - correct answer...Generally speaking, the building official's job is to True. - correct answer...It is required that all manufacturer instructions be at the jobsite at the time of inspection. T or F Kitchen. - correct answer...All of the following are not considered habitable spaces EXCEPT: bathrooms kitchens storage spaces closets 3. - correct answer...Bathrooms must be provided with an aggregate glazing area no less than _____ square feet, half of which must be openable. 44 inches. - correct answer...The maximum height of an egress window above the floor is 5.7 sq ft. - correct answer...A basement bedroom must have an egress window with a clear opening of at least ______ square feet. 3. - correct answer...At least one side-hinged exit door must be in each dwelling unit, and must be _____ feet wide. 30 inches. - correct answer...A porch more than _____ inches above grade must be provided with 36" guards. 200. - correct answer...Wall and ceiling finishes shall have a flame-spread classification of no more than ______ . 7 days. - correct answer...According to code, concrete must reach at least 70% of it's ability within ____________days. 40%. - correct answer...A stud used for a non-bearing partitions may not be notched more than ____% of the stud width. Additions, alterations, renovation and repairs. - correct answer...The Michigan Uniform Energy code applies to new buildings as well as U-factor. - correct answer...___________ is a measure of how well the window or door assembly conducts heat. The lower the number, the better insulation the assembly will provide. 50%. - correct answer...Energy losses from recessed lighting fixtures can often reach ___% of the total thermal loss of a ceiling. R-3. - correct answer...Michigan requires a minimum thermal resistance of ____________for mechanical system piping. True. - correct answer...Oversized HVAC equipment has a higher initial cost, a higher operating cost, provides less comfort, and shorter life expectancy. T or F Prescriptive Path. - correct answer..._______ is the compliance route that applies Table 402.1.1 to building envelope components, and is considered the most simple. Area weighted averages. - correct answer...___________ can be used to satisfy U-factor and SHGC requirements. IC (Insulation Contact) - correct answer...Recessed lights must be _____ rated. True. - correct answer...Up to 15 square feet of glazing per dwelling unit is exempted from U-value requirements. T or F Registered design professional. - correct answer...The 2009 IECC requires a permanent certificate posted on the electrical distribution panel. The certificate shall be completed by the builder or State energy code requirements. - correct answer...One hurdle contractors face when bidding for an energy efficient project is choosing materials that fit the design, and also meet False. - correct answer...Historically significant buildings are not exempt from code changes. T or F R-value Settled thickness Manufacturer name - correct answer...Insulation products (blown and sprayed) must be documented with: March 2011. - correct answer...The new Michigan codes took effect in 10. - correct answer...Below grade walls are insulated from the top of the basement wall down to _____ below grade, or the basement floor, whichever is less. Area weighted average. - correct answer...The _______ is the combined Solar Heat Gain Coefficient of all the glazed fenestration products in the building. Thermal insulation R-values Design criteria Equipment systems - correct answer...Plans and specifications must be detailed in regards to: 2009. - correct answer...In Michigan, the residential energy code is based on the _____ IECC, with certain amendments. Air leakage. - correct answer...___________ is the rate of air infiltration in the presence of a specific pressure differential. Windows Attic access hatches Recessed lights - correct answer...Air leakage is the random movement of air into and out of ________ through cracks and holes. Table 402.1.1 2009 IECC - correct answer...R-values for insulation and fenestration requirements by component can be found in International Energy Conservation Code - correct answer...IECC U-factor and UA alternatives. - correct answer...The _____________ compliance method allows for more innovative construction techniques like SIPs or Advanced Framing. 500 sq feet - correct answer...R-30 is permitted in vaulted ceilings, but is limited to True. - correct answer...Floor insulation must be installed to maintain permanent and continuous contact with the underside of the subfloor decking. T or F 5, 6 and 7. - correct answer...Michigan falls into climate zones False. - correct answer...It is permissible for supply ducts to be run through the framing cavities of a residential building. T or F IC rated (Insulation Contact) - correct answer...__________ means an electrical fixture has been tested and listed as suitable for installation in a cavity where the fixture may come in contact with insulation. 3%. - correct answer...According to the Dept. of Energy, improved energy codes could reduce CO2 emissions by 300 sq ft. - correct answer...Attic insulation markers must be installed every _____ square feet. True. - correct answer...Buildings that are exempted from the new regulations are those with very low energy use or ones that are neither heated or cooled. T or F Yes. - correct answer...A contractor needs to remove a non-load bearing wall, does he need to pull a permit? No. - correct answer...A concrete contractor has been hired by an owner to install a driveway and sidewalks. The lot is flat and the concrete is being place on undisturbed earth with a prepared base. Does the contractor need to pull a permit? Yes. - correct answer...A permit has been issued for a building project and there is a code infraction in the building plans that has been overlooked by the building official. Can the building official require a correction to a project that they previously overlooked? Health department. - correct answer...Who issues a well and septic permit? 200 sq. feet. IRC R105 - correct answer...Permits are not required for one story detached accessory structures not exceeding: The next business day. - correct answer...If work requiring a permit is provided in an emergency situation, the permit application must be submitted within: True. - correct answer...If an inspection official is refused entry to a building project, the official will have recourse to the remedies provided by law which include securing a warrant from the court and returning with an officer of the law. No. IRC R104.8 - correct answer...Can a building official be held liable for any damage occurring to persons or property as a result of their actions or inaction? Yes. - correct answer...An owner needs a foundation wall repaired, it has seriously buckled due to excessive lateral loading from soil pressure. Does the contractor need to pull a permit? 6 ft. IRC R105.2 - correct answer...Although contractors should check for restrictive covenants and local zoning requirements, a permit isn't required from the building official for installing a fence not over _______ tall. 180 days. - correct answer...If a permit is applied for but not yet approved and the applicant is not persueing approval after______ days the application will be considered abandoned. Yes. - correct answer...Can a building official revoke a Certificate of Occupancy? True. - correct answer...When a project requiring a permit has commenced prior to the issuance of a permit, the building official is authorized to charge an additional fee. T or F 450 - correct answer...Foam plastic is used as insulation. The flame spread index cannot exceed 75 and the smoke development index cannot exceed

Mostrar más Leer menos
Institución
Michigan Builders License
Grado
Michigan builders license











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Michigan builders license
Grado
Michigan builders license

Información del documento

Subido en
12 de agosto de 2024
Número de páginas
56
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Michigan Builders License Exam
Questions With 100%Verified Answers
A+GRADED
Created to serve as a complete, comprehensive code regulating the construction of
single-family, two-family and buildings consisting of three or more townhouse units. -
correct answer...✔✔IRC (International Residential Code)

Administrative - correct answer...✔✔First 2 chapters of code book are

True - correct answer...✔✔Plans or supporting documents are almost always required
by the controlling authority prior to issuing a permit. T or F

Yes - correct answer...✔✔Does the building official have the authority to render
interpretations of the code?

8 foot fence. - correct answer...✔✔None of the following require a permit, EXCEPT:
sidewalks and driveways
tiling
an 8 foot fence
playground equipment

False - correct answer...✔✔Tables and illustrations are always supported by
information found in the written code and footnotes. T or F

Live load. - correct answer...✔✔The amount of evenly distributed weight imposed by
inhabitants, goods and removable objects on a floor or roof system is referred to as

True. - correct answer...✔✔If a code requirement is in the book, it is both acceptable
and enforceable by the code official. T or F

Figures. - correct answer...✔✔Illustrations are typically referred to as

Determine that buildings are built to the minimum enforceable standard. - correct
answer...✔✔Generally speaking, the building official's job is to

True. - correct answer...✔✔It is required that all manufacturer instructions be at the
jobsite at the time of inspection. T or F

Kitchen. - correct answer...✔✔All of the following are not considered habitable spaces
EXCEPT:


AGRADESOLUTIONS

,bathrooms
kitchens
storage spaces
closets

3. - correct answer...✔✔Bathrooms must be provided with an aggregate glazing area
no less than _____ square feet, half of which must be openable.

44 inches. - correct answer...✔✔The maximum height of an egress window above the
floor is

5.7 sq ft. - correct answer...✔✔A basement bedroom must have an egress window with
a clear opening of at least ______ square feet.

3. - correct answer...✔✔At least one side-hinged exit door must be in each dwelling
unit, and must be _____ feet wide.

30 inches. - correct answer...✔✔A porch more than _____ inches above grade must be
provided with 36" guards.

200. - correct answer...✔✔Wall and ceiling finishes shall have a flame-spread
classification of no more than ______ .

7 days. - correct answer...✔✔According to code, concrete must reach at least 70% of
it's ability within ____________days.

40%. - correct answer...✔✔A stud used for a non-bearing partitions may not be
notched more than ____% of the stud width.

Additions, alterations, renovation and repairs. - correct answer...✔✔The Michigan
Uniform Energy code applies to new buildings as well as

U-factor. - correct answer...✔✔___________ is a measure of how well the window or
door assembly conducts heat. The lower the number, the better insulation the assembly
will provide.

50%. - correct answer...✔✔Energy losses from recessed lighting fixtures can often
reach ___% of the total thermal loss of a ceiling.

R-3. - correct answer...✔✔Michigan requires a minimum thermal resistance of
____________for mechanical system piping.

True. - correct answer...✔✔Oversized HVAC equipment has a higher initial cost, a
higher operating cost, provides less comfort, and shorter life expectancy. T or F



AGRADESOLUTIONS

,Prescriptive Path. - correct answer...✔✔_______ is the compliance route that applies
Table 402.1.1 to building envelope components, and is considered the most simple.

Area weighted averages. - correct answer...✔✔___________ can be used to satisfy U-
factor and SHGC requirements.

IC (Insulation Contact) - correct answer...✔✔Recessed lights must be _____ rated.

True. - correct answer...✔✔Up to 15 square feet of glazing per dwelling unit is
exempted from U-value requirements. T or F

Registered design professional. - correct answer...✔✔The 2009 IECC requires a
permanent certificate posted on the electrical distribution panel. The certificate shall be
completed by the builder or

State energy code requirements. - correct answer...✔✔One hurdle contractors face
when bidding for an energy efficient project is choosing materials that fit the design, and
also meet

False. - correct answer...✔✔Historically significant buildings are not exempt from code
changes. T or F

R-value
Settled thickness
Manufacturer name - correct answer...✔✔Insulation products (blown and sprayed)
must be documented with:

March 2011. - correct answer...✔✔The new Michigan codes took effect in

10. - correct answer...✔✔Below grade walls are insulated from the top of the basement
wall down to _____ below grade, or the basement floor, whichever is less.

Area weighted average. - correct answer...✔✔The _______ is the combined Solar
Heat Gain Coefficient of all the glazed fenestration products in the building.

Thermal insulation R-values
Design criteria
Equipment systems - correct answer...✔✔Plans and specifications must be detailed in
regards to:

2009. - correct answer...✔✔In Michigan, the residential energy code is based on the
_____ IECC, with certain amendments.

Air leakage. - correct answer...✔✔___________ is the rate of air infiltration in the
presence of a specific pressure differential.


AGRADESOLUTIONS

, Windows
Attic access hatches
Recessed lights - correct answer...✔✔Air leakage is the random movement of air into
and out of ________ through cracks and holes.

Table 402.1.1
2009 IECC - correct answer...✔✔R-values for insulation and fenestration requirements
by component can be found in

International Energy Conservation Code - correct answer...✔✔IECC

U-factor and UA alternatives. - correct answer...✔✔The _____________ compliance
method allows for more innovative construction techniques like SIPs or Advanced
Framing.

500 sq feet - correct answer...✔✔R-30 is permitted in vaulted ceilings, but is limited to

True. - correct answer...✔✔Floor insulation must be installed to maintain permanent
and continuous contact with the underside of the subfloor decking. T or F

5, 6 and 7. - correct answer...✔✔Michigan falls into climate zones

False. - correct answer...✔✔It is permissible for supply ducts to be run through the
framing cavities of a residential building. T or F

IC rated (Insulation Contact) - correct answer...✔✔__________ means an electrical
fixture has been tested and listed as suitable for installation in a cavity where the fixture
may come in contact with insulation.

3%. - correct answer...✔✔According to the Dept. of Energy, improved energy codes
could reduce CO2 emissions by

300 sq ft. - correct answer...✔✔Attic insulation markers must be installed every _____
square feet.

True. - correct answer...✔✔Buildings that are exempted from the new regulations are
those with very low energy use or ones that are neither heated or cooled. T or F

Yes. - correct answer...✔✔A contractor needs to remove a non-load bearing wall, does
he need to pull a permit?

No. - correct answer...✔✔A concrete contractor has been hired by an owner to install a
driveway and sidewalks. The lot is flat and the concrete is being place on undisturbed
earth with a prepared base. Does the contractor need to pull a permit?


AGRADESOLUTIONS
9,71 €
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
agradesolutions Oxford University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
155
Miembro desde
1 año
Número de seguidores
3
Documentos
1611
Última venta
12 horas hace

2,9

21 reseñas

5
6
4
2
3
4
2
2
1
7

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes