Advanced Operations Management AOM4801 (AOM4801)
University of South Africa (Unisa)
Here are the best resources to pass Advanced Operations Management AOM4801 (AOM4801). Find Advanced Operations Management AOM4801 (AOM4801) study guides, notes, assignments, and much more.
All 10 results
Sort by:
-
Essay
AOM4801 ASSIGNMENT 03 2025 3.1.1 ABW have recently built a new production facility at Rosslyn, Pretoria, for the ABW 5-Series. With reference to their new production facility, elaborate on the economic trade-off between the cost of capacity and the opp
-
--137August 20252025/2026A+
- AOM4801 ASSIGNMENT 03 2025 
3.1.1 ABW have recently built a new production facility at Rosslyn, Pretoria, for 
the ABW 5-Series. With reference to their new production facility, elaborate on 
the economic trade-off between the cost of capacity and the opportunity cost of 
not having adequate capacity. (4)
-
R70,00 More Info
eliteacademicinstitute
-
Essay
AOM4801 ASSIGNMENT 03 2025 QUESTION 3.1 CAPACITY MANAGEMENT 3.1.1 ABW have recently built a new production facility at Rosslyn, Pretoria, for the ABW 5-Series. With reference to their new production facility, elaborate on the economic trade-off betwee
-
---36August 20252025/2026A+
- AOM4801 ASSIGNMENT 03 2025 
QUESTION 3.1 CAPACITY MANAGEMENT 
3.1.1 ABW have recently built a new production facility at Rosslyn, Pretoria, for 
the ABW 5-Series. With reference to their new production facility, elaborate on 
the economic trade-off between the cost of capacity and the opportunity cost of 
not having adequate capacity. (4)
-
R60,00 More Info
excelgateinstitute
-
Essay
AOM4801 SEMESTER 1 2025 ASSIGNMENT 02 2025 2.1: GOODS AND SERVICE DESIGN 2.1.1 Collier and Evans (2021:107) note that companies use some type of structured process to design and improve goods and services. Exhibit 5.1 provides a generic summary of these
-
5.0(1)5.0248May 20252024/2025A+
- AOM4801 SEMESTER 1 2025 ASSIGNMENT 02 2025 
 
 
2.1: GOODS AND SERVICE DESIGN 
2.1.1 Collier and Evans (2021:107) note that companies use some type of structured process to design and improve goods and services. Exhibit 5.1 provides a generic summary of these steps. For Toyota car assembly, these steps can be understood as follows:
-
R90,00 More Info
excelgateinstitute
-
Essay
AOM4801 ASSIGNMENT 2 SEMESTER 1 2024 Research and write a short paper (approximately 1.5 typed pages) advocating for customer focused design. Assume you are the new owner of a franchised Nando’s fast-food outlet. The outlet you have purchased allows f
-
--123May 20242023/2024A+
- AOM4801 ASSIGNMENT 2 SEMESTER 1 2024 
 
Research and write a short paper (approximately 1.5 typed pages) advocating for customer focused design. 
 
Assume you are the new owner of a franchised Nando’s fast-food outlet. The outlet you have purchased allows for customers to be serviced via three different channels, namely 
 
Based on your understanding of the typical operations at such a Nando’s fast-food outlet, describe practical examples to demonstrate your understanding of each of the fo...
-
R80,00 More Info
BMZAcademy