100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

VA DEQ ECS/ SWM Inspector Exam (Latest 2026/ 2027 Update) 100% Verified Questions & Answers

Rating
-
Sold
-
Pages
43
Grade
A+
Uploaded on
20-12-2025
Written in
2025/2026

VA DEQ ECS/ SWM Inspector Exam (Latest 2026/ 2027 Update) 100% Verified Questions & Answers

Institution
VA DEQ ECS/ SWM Inspector
Course
VA DEQ ECS/ SWM Inspector











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
VA DEQ ECS/ SWM Inspector
Course
VA DEQ ECS/ SWM Inspector

Document information

Uploaded on
December 20, 2025
Number of pages
43
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

VA DEQ ECS/ SWM Inspector Exam
(Latest 2026/ 2027 Update) 100%
Verified Questions & Answers
VESCP -CORRECTANSWER Virginia Erosion and Sediment Control Program



- Administered by counties/cities (must), towns (may)

- MUST BE APPROVED



Minimum Standard 1 -CORRECTANSWER Stabilization



permanent or temporary soil stabilization shall be applied to denuded areas within

seven days after final grade is reached on any portion of the site; temporary soil

stabilization shall be applied within seven days to denuded areas that may not be at

final grade but will remain dormant for longer than 14 days; permanent stabilization shall

be applied to areas that are to be left dormant for more than one year



Site NOT at Final Grade -CORRECTANSWER - stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year

,Site at Final Grade -CORRECTANSWER - stabilize in 7 days (recommended

immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw



Minimum Standard 2 -CORRECTANSWER Stock Piles, Waste and Borrow Areas



during construction, soil stock piles and borrow areas shall be stabilized or protected

with sediment trapping measures



mulch prevents erosion by protecting the surface from raindrop impact and silt fence

intercepts and detains from disturbed areas



Minimum Standard 3 -CORRECTANSWER Permanent Vegetation



permanent vegetation cover shall be established on denuded areas not otherwise

permanently stabilized (permanent vegetation shall not be considered established until

a ground cover is achieved that is uniform, mature enough to survive, and will inhibit

erosion *there is no % associated with this*)



reduce erosion and decrease sediment yield from disturbed area



this is the standard used to verify that a site is ready for release of bonds or surety

,Minimum Standard 4 -CORRECTANSWER First-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures

intended to trap sediment shall be constructed as a first step in any land-disturbing

activity and shall be made functional before upslope land disturbance takes place



a certain amount of initial land disturbance may be required to provide access for

equipment to install the perimeter controls, but site clearing and grading should be kept

to a minimum until the perimeter controls are in place



intercepts and detains small amounts of sediment from disturbed areas during

construction operation to prevent sediment from leaving the site and decrease velocity

of sheet flows and low-to-moderate level channel flow



Perimeter Controls -CORRECTANSWER assures that sediment does not leave the

perimeter of the land-disturbing area once site clearing, grading, and construction

commences



Examples: silt fences, sediment traps, sediment basins, construction entrance,

temporary diversions, diversions



Minimum Standard 5 -CORRECTANSWER Earthen Structure Stabilization

, stabilization measures shall be applied to earthen structures such as dams, dikes, and

diversions immediately after installation



reduce erosion and sedimentation and reduce damage from sediment and runoff to

downstream or off-site areas



Minimum Standard 6 -CORRECTANSWER Traps and Basins



sediment traps and basins shall be designed and constructed based upon the total

drainage area (not just disturbed area) to be served by the trap or basin



Sediment Traps -CORRECTANSWER minimum storage capacity shall be 134 cubic

yards per acre of drainage area and shall only control drainage areas less than 3 acres



*stone outlet = trap*



Sediment Basins -CORRECTANSWER surface runoff from disturbed areas that is

comprised of flow from drainage areas greater than or equal to 3 acres shall be

controlled by a basin; minimum storage capacity of a sediment basin shall be 134 cubic

yards per acre of drainage area; the outfall system shall, at a minimum, maintain the

structural integrity of the basin during a 25-year storm of 24-hour duration; runoff

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EduDocsMarket Chamberlain College Nursing
Follow You need to be logged in order to follow users or courses
Sold
146
Member since
1 year
Number of followers
5
Documents
2013
Last sold
7 hours ago

4,1

9 reviews

5
5
4
2
3
1
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions