Umd is a public university that recently completed a bidding process for a new academic center.
Most of the bid documents will become _______ that define the legal terms of the contract. The
contract between GCs and subs typically reference these documents ✔Correct Answer--Contract
documents
A variety of separate documents typically comprise the contract documents. Select all of the
following ✔Correct Answer--Drawing and specifications, general conditions, addenda and
modifications
The agreement consists of facts about project, and it is the most important document taking
precedence over all others. It provides GC opportunity to identify problematic... ✔Correct
Answer--Exclusions
General condition outline the rights and responsibilities of the owner, designer, and contractor. For
vertical construction the AIA provides a startled conditions in A201... ✔Correct Answer--General
provisions, protection of persons and property, termination of suspension of the contract, insurance
and bonds.
Supplementary conditions are not an essential part of contract documents as general conditions
provide specific elements for the project ✔Correct Answer--False
Specifications are an important part of the contract document la as they describe in written form
information that cannot be conveyed by drawings alone ✔Correct Answer--Quality assurance,
quality of materials and products, submittals, special installation requirements
The constructions specifications institute developed the master format standard for organizing
contract specifications. Up to year 2004, it provided 16 divisions of works. What are two applicable
divisions for concrete and electrical work ✔Correct Answer--3 and 16
Umd selects jw builders as the gc to build a new academic center. Select all of the typical pre
construction activities the gc will handle before work begins ✔Correct Answer--Jobsite layout plan,
reconstruction meeting, determining means and methods of construction, creating a master
construction schedule
Jw builders will select a number of different types of insurance to manage their risks during the job.
Select the appropriate coverage to protect against perils for construction in progress ✔Correct
Answer--Builders risk insurance
During construction, jw builders will have many responsibilities that include which of the following?
✔Correct Answer--Maintaining a safe and clean jobsite, submitting payment requests, correcting
work rejected by owner or architect
The superintendent for jw builders will maintain a daily job report that will document the daily
activities and conditions on the jobsite. Select all important items that are typically included in this
daily report ✔Correct Answer--Equipment on the jobsite, number and type of workers on jobsite,
daily weather summary, materials and product deliveries