The piping shall be tested at _____ times the max working
pressure applicable to that part of the piping system but at a
pressure ____ than the test pressure required for the storage
tank.
1/2, less
The min pressure for testing tanks shall be ____ times the max
working pressure but in no case less than ____ psi.
1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and
_____ have been visually inspected for ___, but in no case less
than _____ hour.
Joints, connections, leaks, 1/2 hour.
A record must be kept of the pressure test showing the name
of the _____ and the _____ at which the piping and tank were
tested.
Contractor, pressure
Page 1 of 22
,Gas piping must be tested by the _____ before operation.
Contractor
For oil burning systems, ____ ____ giving instructions for the
care and operation of the system shall be permanently located
in an easily _____ and _____ location near the equipment.
Instruction Cards, visible, accessible
No oil burning equipment shall be operated until an equipment
____ _____ has been issued by the commissioner, the
requirements of the ____ ____ control code have been met and
until the approval for the storage of ____ ____ has been given
by the fire commissioner.
Use permit, air pollution, fuel oil
Every oil burning installation that is not fully automatic or
requires preheating shall be operated under the direct
supervision of a person holding a ____ ___ ______ issued by the
FD.
COF
Page 2 of 22
, Such person must be in the building at ____ ____ while in
operation and present in the _____ _____ during startup.
All times, boiler room
After any repairs to the boiler are made, ______ shall check the
repairs and the functioning of all ____ _____ and the positioning
of the ______.
Operators, control devices, valves
fill line in an oil burner system is a line used to:
Fill the storage tank with oil.
The aquastat is located
Below the water line.
All heating, combustion, and cooking equipment shall be
installed with adequate clearances from _______ construction.
Combustible
The equipment must be provided with ______ or the building
construction shall be _____ _____.