100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

February 2025 DPWH Project Engineer Exam Questions and Answers

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
05-12-2025
Written in
2025/2026

February 2025 DPWH Project Engineer Exam Questions and Answers

Institution
DPWH
Course
DPWH









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
DPWH
Course
DPWH

Document information

Uploaded on
December 5, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

February 2025 DPWH Project
Engineer Exam Questions and Answers


Construction Safety and Health Program - Answer- refers to a set of detailed rules to
cover processes and practices that should
be utilized in a specific construction site including the personnel responsible and the
penalties for the violation thereof,

4-24 hours - Answer- Sawing of the joint shall commence as soon as the concrete
hardened sufficiently to permit sawing without excessive raveling.

30 minutes - Answer- Transverse construction joint shall be constructed when there is
an interruption of more than minutes in concreting operation.

1.5 m - Answer- The transverse joint shall be constructed within _____ .

7 and 28 - Answer- With in ___ calendar days the contractor has commenced work or
within ____ calendar
days after the circumstances or reasons justifying a claim for extra cost shall be
occurred.

Termination of Default - Answer- refers to the termination of the contract for (DGCS) in
infrastructure project when the contractor has incurred negative of 15% or more, or
when the contract has expired and has negative slippage of 10% or more?

Parcellary Survey - Answer- type of survey is undertaken when a proposed project land

Structural Numbers - Answer- Represents the overall structural requirement of a flexural
needed to sustain the design traffic loading?

2% - Answer- The asphalt pavement represented by the core shall be accepted if
deficiency in density is more than _____?

1.5m and 1:12 - Answer- The length of a ramp should not exceed 6.0m if the gradient is
____ longer ramps whose gradient is ____ shall be provided with landing not less than
_____

1 Layer - Answer- If the design thickness of aggregate sub base course is 200mm. In
how many layers may be the material be spread and compacted?

50 years - Answer- What is the minimum design life span of bridge years?

, Shear Failure - Answer- The transverse reinforcement in yielding, performance of
reinforced concrete columns of bridges, which mode of failure does this sieve?

Maximum Experience Flood Level (MEFL) - Answer- Highest level of elevation in
revetment

100 mm - Answer- Minimum thickness of bedding material beneath a concrete pipe

Diesel hammer - Answer- Most common pile hammer used in the Philippines

Check the actual bearing capacity - Answer- Bearing capacity test shall be conducted at
location as specified in the plans or as
designated by the project engineer to determine ______?

50% - Answer- Pile integrity test shall be conducted on at least _____

20 cm x 40 cm - Answer- Standard size of CHB

25 years - Answer- In flood design structure pccp, box culvert, roads, rcpc

1:3 - Answer- Mortar for grouted rip rap shall be consist of sand, gravel, cement and
water

Entry - Answer- Where should stop line be placed at 4 legged road

0.90 m - Answer- What is the minimum width of PWD ramp

5 - Answer- In portal cement stabilized road mixed base coarse preparation the
contractors shall not be permitted to drive heavy equipment over completed portions
prior to the end during period except pneumatic -tired equipment required for
constructing adjoining
sections.

0.30 mm - Answer- Strength for reinforcement concrete culvert pipes (RCCP) shall not
calculated in terms of KN per linear meter to produce ____ mm crack ultimate road.

Lag Time - Answer- It refers to the amount of time where by a successor activity can be
delayed with respect to the predecessor activity under a precedence diagram method
(PDM).

5.34 - Answer- What is the standard weight of 6m long, 12mm diameter RSB graded
40?

Armor the breached section with gabions mattress and spur dike to utilize gap
R284,00
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Document also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
wisdompoint chamberlain college of nursing
Follow You need to be logged in order to follow users or courses
Sold
114
Member since
2 year
Number of followers
66
Documents
5307
Last sold
1 day ago
Nursing Tec

3,7

16 reviews

5
6
4
3
3
5
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions