Pipefitter NCCER Test Questions & Answers with Complete Solutions
Science Engineering Mechanical Engineering
Pipefitter NCCER Test Questions & Answers with Complete Solutions
Practice questions for this set
B
socket. What is the purpose of this gap ?
2
3
Pipefitter NCCER Test Questions & Answers with Complete Solutions
,Pipefitter NCCER Test Questions & Answers with Complete Solutions
4
Trapeze
Strap
Convert 1/4 to its decimal equivalent. B
A) .01
B) .25
C) 0.4
D) 0.5
Piping that is field-routed to a pump must C
be supported
A) Off the pump suction
B) Diagonally
C) Independently
D) Off the pump discharge
What is used when lighting a cutting torch A
?
A) Striker
B) Cigarette lighter
C) Match
D) Any open flame
Where is specific information needed to D
install piping and associated items found ?
A) Reliability network
B) Owner of the company
C) Material Manufacturer
D) Standards and Specifications
Damaged and broken tools should be C
A) Used if possible
B) Kept for backup
C) Taken out of Service
D) Used for minor tasks
What is the ID of 10'' schedule 80 piping. C
A) 9 3/16
B) 9 5/16
C) 9 9/16
D) 10 1/16
Pipefitter NCCER Test Questions & Answers with Complete Solutions
, Pipefitter NCCER Test Questions & Answers with Complete Solutions
The two steps in making up threaded joints B
are the hand engagement and
A) Machine makeup
B) Wrench makeup
C) Driver makeup
Pipefitter NCCER Test Questions & Answers with Complete Solutions
Science Engineering Mechanical Engineering
Pipefitter NCCER Test Questions & Answers with Complete Solutions
Practice questions for this set
B
socket. What is the purpose of this gap ?
2
3
Pipefitter NCCER Test Questions & Answers with Complete Solutions
,Pipefitter NCCER Test Questions & Answers with Complete Solutions
4
Trapeze
Strap
Convert 1/4 to its decimal equivalent. B
A) .01
B) .25
C) 0.4
D) 0.5
Piping that is field-routed to a pump must C
be supported
A) Off the pump suction
B) Diagonally
C) Independently
D) Off the pump discharge
What is used when lighting a cutting torch A
?
A) Striker
B) Cigarette lighter
C) Match
D) Any open flame
Where is specific information needed to D
install piping and associated items found ?
A) Reliability network
B) Owner of the company
C) Material Manufacturer
D) Standards and Specifications
Damaged and broken tools should be C
A) Used if possible
B) Kept for backup
C) Taken out of Service
D) Used for minor tasks
What is the ID of 10'' schedule 80 piping. C
A) 9 3/16
B) 9 5/16
C) 9 9/16
D) 10 1/16
Pipefitter NCCER Test Questions & Answers with Complete Solutions
, Pipefitter NCCER Test Questions & Answers with Complete Solutions
The two steps in making up threaded joints B
are the hand engagement and
A) Machine makeup
B) Wrench makeup
C) Driver makeup
Pipefitter NCCER Test Questions & Answers with Complete Solutions