100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4,6 TrustPilot
logo-home
Exam (elaborations)

“QUALITY MANAGEMENT FINAL EXAM 2025 “ NEWEST UPDATED EXAM 2025 – 2026 SOLVED QUESTIONS & ANSWERS VERIFIED 100% GRADED A+ (LATEST VERSION) WELL REVISED AND HIGHLY RECOMMENDALE| ALREADY PASSED!!

Rating
-
Sold
-
Pages
97
Grade
A+
Uploaded on
24-11-2025
Written in
2025/2026

“QUALITY MANAGEMENT FINAL EXAM 2025 “ NEWEST UPDATED EXAM 2025 – 2026 SOLVED QUESTIONS & ANSWERS VERIFIED 100% GRADED A+ (LATEST VERSION) WELL REVISED AND HIGHLY RECOMMENDALE| ALREADY PASSED!!

Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
November 24, 2025
Number of pages
97
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Page 1 of 97


“QUALITY MANAGEMENT FINAL EXAM 2025 “ NEWEST UPDATED EXAM 2025 – 2026
SOLVED QUESTIONS & ANSWERS VERIFIED 100% GRADED A+ (LATEST VERSION)
WELL REVISED AND HIGHLY RECOMMENDALE| ALREADY PASSED!!




Quality Management | Final Exam Study




Which of the following is the least useful sales forecasting model to use when
sales are increasing?
a) Trend adjusted exponential smoothing
b) Simple mean
c) Exponential smoothing
d) Weighted moving average
e) Naive
b) Simple mean
Which is typically the most difficult data pattern to predict?
a) Horizontal
b) Trend
c) Level
d) Seasonality
e) Cycle
e) Cycle
The first step in forecasting is:
a) determine what data is available.
b) decide what to forecast.
c) evaluate and analyze appropriate data.
d) select and test the forecast model.
e) establish the forecast accuracy requirements.
b) decide what to forecast.

, Page 2 of 97


In exponential smoothing, which of the following values α would generate the
most stable forecast where Ft+1 = α.At + (1-α)Ft?
a) 0.10
b) 0.25
c) 0.50
d) 0.75
e) 1.00
a) 0.10
Suppose that you are using the exponential smoothing forecasting method,
and this period's forecast (Ft) was 100% accurate (i.e., no error). If α=.5, which
of the following is definitely true?
a) Next period's forecast will also be 100% accurate.
b) Next period's forecast equals this period's actual.
c) This period's forecast must be thrown out, and next period's forecast equals
Ft-1 + α(At-1α - Ft-1).
d) Next period's forecast equals 50% of this period's forecast.
e) Next period's forecast equals 50% more than this period's forecast.
b) Next period's forecast equals this period's actual.
Which of the following forecasting methods would be most accurate if demand
were rapidly decreasing?
a) 3-month moving average
b) 6-month moving average
c) 12-month moving average
d) Simple mean
a) 3-month moving average
Which of the following is a reason capacity and location decisions are usually
made simultaneously?
a) in order to get them in the operating budget on a consistent basis
b) it makes it easier to understand capacity
c) often there is not enough time available to separate them
d) the require the same types of information
e) the size of a new facility may affect its location
e) the size of a new facility may affect its location

, Page 3 of 97


Investments in building or purchasing long-term production facilities are
inherently risky due to ________.
a) uncertainty in forecasting future demands
b) unexpected changes in interest rates
c) corporate mergers
d) rapid technology changes
a) uncertainty in forecasting future demands
Input measures of capacity work better when a company produces
__________.
a) discrete items
b) a single product
c) liquids
d) many different products
d) many different products
The maximum output rate that can be achieved by a facility under ideal
conditions is _________.
a) utilization
b) design capacity
c) effective capacity
d) ultimate capacity
e) temporary capacity
b) design capacity
The ratio of actual output rate to capacity is ___________.
a) effectiveness
b) effective capacity
c) throughput
d) utilization
e) productivity
d) utilization
The best operating levels is the volume of output that results in the _________.
a) lower average unit cost
b) most revenue
c) maximum use of machinery

, Page 4 of 97


d) best quality
e) optimum product mix
a) lowest average unit cost
Your author indicates that although statistical inspection is an important
approach to improving quality, it is inherently:
A. wrong
B. evil
C. reactive
D. difficult
E. philosophical
C. reactive
Which one of the following is an industry not eligible for the MBNQA?
A. manufacturing firms
B. service sector firms
C. healthcare firms
D. consulting firms
E. not-for- profit firms
E. not-for- profit firms
Which one of the following is an industry not eligible for the MBNQA?
A. manufacturing firms
B. service sector firms
C. public sector organizations
D. healthcare firms
E. consulting firms
E. consulting firms, ( 2 alike answer is E)
The MBNQA is not open to
A. small companies (less than 500 employees)
B. service providers
C. health care companies
D. large companies (over 500 employees)
E. not-for-profit organizations
E. not-for-profit organizations
How many winners of the MBNQA can there be each year?
A. 1
R783,88
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
LECErnest
5,0
(1)

Get to know the seller

Seller avatar
LECErnest Chamberlain College Nursing
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
7 months
Number of followers
0
Documents
659
Last sold
1 week ago
Best Quality revision materials

Best quality exams Latest exams Previous exams Which are graded A+ and verified 100% Study guides Quality notes Recommended for students to help them ease their revisions and understand the content well

5,0

1 reviews

5
1
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions